(U)Executive Helo Development

Abstract

The VH-92A is the replacement helicopter for the VH-3D and the VH-60N, the aircraft currently used by Marine Helicopter Squadron One (HMX-1) to transport the President, Vice President, and other distinguished officials as directed by the White House Military Office. The VH-3D and VH-60N are approaching the end of their service lives. Funding for the VH-92A program supports Engineering and Manufacturing Development Phase activities, including: integration of systems; production, qualification, and support of test articles; development of logistics products; and demonstration of system integration, interoperability, safety, and utility.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2019
Source ID
0604273M_5_1319_PB_2019
Change Summary Explanation
Funds increase from FY 2018 to FY 2019 due to transfer of effort from PE 0604273N beginning in FY 2019. Technical: Not applicable. Schedule: 1. The program is planning to meet the Full Rate Production (FRP) entrance criteria earlier than originally stated in the Acquisition Program Baseline (3Q FY2021), therefore the FRP milestone has moved from 3Q FY2021 to 1Q FY2021. 2. The Contractor Logistics Support completion and commencement of Interim Contractor Support has moved from 2Q FY 2021 to 1Q FY 2021 to align with the completion of the EMD contract. 3. To better align with Milestone C and contract delivery dates, Low Rate Initial Production (LRIP) Lot 1 contract award moved from 3Q FY 2019 to 2Q FY 2019 and LRIP Lot 1 delivery schedule moved from 2Q FY 2021 to 3Q FY 2021. 4. Engineering Development Model (EDM) 2 aircraft delivery shifted from 4Q FY 2018 to 1Q FY 2019 and commencement of SDTA deliveries shifted from 1Q FY 2019 to 2Q FY 2019 to align with contract delivery dates. 5. Initial Operational Test and Evaluation (IOT&E) commencement shifted right two months within 1Q FY 2020 from October to December due to align with SDTA aircraft deliveries. 6. LFT&E Report shifted from 4Q FY 2020 to 1Q FY 2021 commensurate with completion of LFT&E in 4Q FY 2018. 7. IOT&E Report completion shifted from 3Q FY 2020 to 4Q FY 2020 to align with the revised completion timeframe of IOT&E. Systems Engineering: Not applicable. Logistics: Not applicable. Contracting: Not applicable. Deliveries: One (1) Engineering Development Model (EDM) aircraft Four (4) System Demonstration Test Articles (SDTA) aircraft Twelve (12) Low Rate Initial Production (LRIP) aircraft Five (5) Full Rate Production (FRP) aircraft
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Air Platforms
  • Cyber

DTIC Thesaurus Topics

  • Acquisition
  • Aircrafts
  • Configuration Management
  • Contractors
  • Contracts
  • Cost Analysis
  • Developmental Tests
  • Engineering
  • Logistics
  • Logistics Support
  • Maintenance
  • Manufacturing
  • Procurement
  • Program Management
  • Systems Engineering
  • Test And Evaluation
  • Training

Readers

  • Aerospace Engineering

Related Documents