(U)ASE Self Protection Optimization

Abstract

This element includes development of Aircraft Survivability Equipment (ASE) and Electronic Warfare (EW)/countermeasures solutions for the United States Navy, United States Marine Corps and Coalition Aircraft to include studies and evaluations of current and future aircraft threats, modeling and simulation for improved countermeasure capabilities, and development and testing to address new and emerging threats. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under ADVANCED COMPONENT DEVELOPMENT AND PROTOTYPES because it includes all efforts necessary to evaluate integrated technologies, representative models or prototype systems in a high fidelity and realistic operating environment.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2017
Source ID
0604279N_4_1319_PB_2017
Change Summary Explanation
Cost: PU 3309: FY15 reprogramming action #FY 15-28 PA signed 27 August 2015 to address JUONS #SO-0010 to improve the current system-of-systems detect, declare and defeat solution against newly proliferated advanced Man-portable Air Defense Systems (MANPADS). OCO issued sheet #15-401-R dated 15 October 2015. Schedule: Project Unit 3308 / Technology Development: Release 15 added to 1st Qtr of FY 2016. Release 16 moved from 3rd Qtr FY 2016 to 1st Qtr FY 2017 to better align with Program Related Engineering (PRE) Software releases. This is reflected in the Budget under PE 0604270N. Software Technique Development completion moved from 4th Qtr FY 2016 to 3rd Qtr FY 2015 to annualize effort. FY 2016 Software Technique Development 1st Qtr FY 2016 through 3rd Qtr FY 2016 added to schedule. FY 2015 Integrated Evaluation (IE) moved from 2nd Qtr FY 2015 through 4th Qtr 2015 to 1st Qtr 2016 and reduced to a 1 Qtr event. FY 2016 IE moved from 2 Qtr FY 2016 through 4th Qtr FY 2016 to 4th Qtr FY 2016 as a 1 Qtr event. Project Unit 3309 / Assault Survivability Optimization: FY15 F/A-18E/F flight test delayed by one month due to range priorities; testing completed August 2015. FY15 CH-53E flight test delayed until August 2016 due to test range schedule (other available test ranges could not accommodate required flight test profiles). Schedule revised to include efforts to support JUONS #SO-0010. Technical: Not applicable.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Air Platforms
  • Electronic Warfare

DTIC Thesaurus Topics

  • Acquisition
  • Air Defense
  • Aircrafts
  • Contracts
  • Cost Analysis
  • Costs
  • Electronic Warfare
  • Emerging Threats
  • Engineering
  • Procurement
  • Product Development
  • Prototypes
  • Radio Frequency
  • Software Development
  • Test And Evaluation
  • United States
  • Warfare

Readers

  • Aerospace Engineering
  • Military Science and Technology Research and Modernization.
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Microelectronics

Related Documents