(U)ASE Self Protection Optimization
Abstract
This element includes development of Aircraft Survivability Equipment (ASE) and Electronic Warfare (EW)/countermeasures solutions for the United States Navy, United States Marine Corps and Coalition Aircraft to include studies and evaluations of current and future aircraft threats, modeling and simulation for improved countermeasure capabilities and development and testing to address new and emerging threats. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under ADVANCED COMPONENT DEVELOPMENT AND PROTOTYPES because it includes all efforts necessary to evaluate integrated technologies, representative models or prototype systems in a high fidelity and realistic operating environment.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2018
- Source ID
- 0604279N_4_1319_PB_2018
- Change Summary Explanation
- Cost: Project Unit 3309 / Assault Survivability Optimization: FY 2015 Reprogramming Action - Prior Approval (PA), DoD Serial Number FY 15-28 PA signed 27 August 2015 to address Joint Urgent Operational Need (JUON) (JUONS SO-0010) to improve the current system-of-systems detect, declare and defeat solution against newly proliferated advanced Man-portable Air Defense Systems (MANPADS). Overseas Contingency Operations (OCO) Issue Sheet #15-401-R dated 15 October 2015 for $1.2 million. Additional $1.2 million baseline funding received May 2016 for JUONS SO-0010. Schedule: Project Unit 3308 / Technology Development: Software Release 15 added to 1Q FY16. Software Release 16 moved from 3Q FY16 to 1Q FY17 to better align with Program Related Engineering (PRE) software releases; this is reflected in the budget PE 0604270N. Software Technique Development completion moved from 4Q FY16 to 3Q FY15 to annualize effort. FY16 Software Technique Development 1Q FY16 through 3Q FY16 added to schedule. FY15 Integrated Evaluation (IE) moved from 2Q FY15 through 4Q FY15 to 1Q FY16, and reduced to a 1Q event. FY16 IE moved from 2Q FY16 through 4Q FY16 to 4Q FY16 as a 1Q event. Project Unit 3309 / Assault Survivability Optimization: FY15 CH-53E flight test delayed until August 2016 due to test range schedule (other available test ranges could not accommodate required flight test profiles). Schedule revised to include efforts to support JUONS SO-0010. P-8A effectiveness flight test postponed due to aircraft availability. MJU-67 contract award delayed from 2Q FY16 to 4Q FY16. Test articles quantity increased from 1,500 to 1,552 to accommodated testing requirements based on FY17 test schedule. MV-22 and UH-1Y JUONS Operational MDF delay until 3rd Quarter FY17 due to test results data review and approval process. Technical: N/A
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Technology Development
- Child Accomplishment: Technology Development
- Child Project: Assault Survivability Optimization
- Child Accomplishment: Analysis and Development of Advanced Countermeasures and Countermeasure Techniques