(U)Next Generation Jammer (NGJ) Increment II
Abstract
The Next Generation Jammer (NGJ) is the next step in the evolution of Airborne Electronic Attack (AEA) and is needed to meet current and emerging Electronic Warfare gaps, ensure kill chain wholeness against growing threat capabilities and capacity, and to keep pace with threat weapons systems advances and continuous expansion of the AEA mission area. NGJ is an evolutionary acquisition program providing capability in three increments: Increment 1 (Mid-Band) funded under Program Element 0604274N, Increment 2 (Low-Band) and Increment 3 (High-Band). The order of development - mid, low, and then high - was determined by the threat and available capability. NGJ Increment 2 (NGJ Inc 2) will address the mission need for a robust low band radar and communications jamming capability from an airborne platform that will require capabilities beyond the currently deployed system. Specifically, NGJ Inc 2 will address low-band AEA capability gaps, AEA sufficiency gaps, and address AN/ALQ-99 Tactical Jamming System shortfalls in scalability, flexibility, supportability, interoperability, availability, and capability. NGJ Inc 2 will deliver significantly improved radar and communications jamming capabilities with Open Systems Architecture that supports software and hardware updates to rapidly counter improving threats. Additionally, NGJ Inc 2 will contribute across the spectrum of missions defined in the Defense Strategic Guidance to include strike warfare, projecting power despite anti-access/area denial challenges, and counterinsurgency/irregular warfare.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2018
- Source ID
- 0604282N_5_1319_PB_2018
- Change Summary Explanation
- Technical: Not applicable. Schedule: Development Request for Proposal Release Decision Point (DRRDP) slid from 3QFY2017 to 2QFY2019. Milestone B (MS B) slid from 3QFY2018 to 1QFY2020. Engineering & Manufacturing Development (EMD) phase start shifted from 3QFY2018 to 2QFY2020. H Build Integration start shifted from 3QFY2018 to 2QFY2020. Next Generation Jammer Increment 2 Test & Evaluation Master Plan slid from 4QFY2017 to 4QFY2018. System Readiness Review-1 (SRR-1) was combined with a System Functional Review-1 (SFR-1) and slid from 4QFY2016 to 1QFY2019. System Readiness Review-2 (SRR-2) slid from 3QFY2018 to 3QFY2020. Integrated Baseline Review (IBR) slid from 4QFY2018 to 4QFY2020. Program Decision Review (PDR) was combined with a System Functional Review-2 (SFR-2) and slid from 1QFY2019 to 4QFY2021. Critical Design Review (CDR) slid from 4QFY2021 to FY2023. The following events were added to the schedule: Technology Demonstrators contract start 1QFY2018, Technology Demonstrators Test and Evaluation start 3QFY2019, and System Supportability Review (SSR) was added in 1QFY2021.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Next Generation Jammer Inc II
- Child Accomplishment: Next Generation Jammer Increment 2 Primary Hardware Development
- Child Accomplishment: Next Generation Jammer Increment 2 Systems Engineering
- Child Accomplishment: Next Generation Jammer Increment 2 Support & Management Services
- Child Accomplishment: Next Generation Jammer Increment 2 Test & Evaluation
- Child Accomplishment: Next Generation Jammer Increment 2 Aircraft Integration
- Child Cost Item: 4d3e9de41a085c98c03b7398d2a24d9e
- Child Cost Item: 9a0706c238ff82351778679327c9d52b
- Child Cost Item: 8894d3c46ee2d5e4087424e0c4151bf7
- Child Cost Item: 6b0847c16c634a794210a8ce4cda164c
- Child Cost Item: 909bcd6f6f81536aa20f4f3886c3460b
- Child Cost Item: 3fa34ee95d43761aa3e8fc0bcca3f6bd
- Child Cost Item: 779a6cd1f2ad1fe0dd22f5bbe25c133e
- Child Cost Item: 612f7001aac533b8138248e3ad1c9fd7
- Child Cost Item: 55ae06e3879f7cf32d9eaee3344d286e
- Child Cost Item: 9b9775d1eb80d0611b5271e93d6a5e71
- Child Cost Item: 0d2f11890237a168829a2a99ec0f9bf7
- Child Cost Item: 5413e67fd295c43252b60a8bcb056eb7
- Child Cost Item: 59997ec9a62c741ff11803dce4a249d4
- Child Cost Item: e999a97b37b85c1001c58584f651cf9b
- Child Cost Item: 9fe0813cd6c8e975b253dc805684ef52
- Child Cost Item: 9667826ac304031ed730b4a7ef634c7f
- Child Cost Item: 8db8e1ca57d5427b802ac3644f179d8d
- Child Cost Item: 2070b4e51e1e69e80154026fd6576b9a
- Child Cost Item: 7c056e0b2ab72213f601eb8401f2c2fa
- Child Cost Item: f01510a3e87ac9b34e34a84f5596a815
- Child Cost Item: 43514d6e39652d40ad492fc9bdd586c0
- Child Cost Item: 3172682a178b8271051ad91a9dd43078
- Child Cost Item: 9aebb0aa137144e9fe5494c6eb163519