(U)Next Generation Jammer (NGJ) Increment II

Abstract

The Next Generation Jammer (NGJ) is the next step in the evolution of Airborne Electronic Attack (AEA) and is a critical capability necessary to address current, emerging, and evolving Electronic Warfare gaps, ensure kill chain wholeness against growing threat capabilities and capacity, keep pace with enemy threat weapon systems' advancements, and support the continuous expansion of the AEA mission areas that exceed the capability of currently fielded systems. NGJ will utilize enhanced techniques and tactics to deliver significantly improved radar and communications jamming effectiveness as well as other classified capabilities. Utilizing an Open Systems Architecture that supports software and hardware updates to rapidly counter emergent and evolving threats, NGJ is a key enabler and force multiplier for operations across the spectrum of missions defined in the Defense Strategic Guidance, including strike warfare, projecting power despite highly contested environments, and counterinsurgency/irregular warfare. NGJ will also address the shortfalls in scalability, flexibility, supportability, interoperability, availability, and capability of the existing AN/ALQ-99 Tactical Jamming System. This Program Element (PE 0604282N) supports the Next Generation Jammer - Low Band (NGJ-LB) (formerly known as Next Generation Jammer Increment 2) program. NGJ-LB will address AEA capability and sufficiency gaps against enemy threats operating in the lower frequency bands of the electromagnetic spectrum. NGJ-LB will provide the ability to effectively engage enemy threats from increased stand-off distances, employ increased capacity (number of jamming assignments) against enemy targets, and support agile employment by operators. The NGJ-LB system will be integrated on the EA-18G tactical aircraft and will augment and then replace the legacy AN/ALQ-99 Tactical Jamming System Low-Band pods.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2020
Source ID
0604282N_5_1319_PB_2020
Change Summary Explanation
The FY 2020 funding request was reduced by $16.831 million to account for the availability of prior year execution balances. Technical: Not applicable. Schedule: Pending the program decision point path forward (4th Qtr. 2019) and authority to release either the RFP for EMD or the Rapid Prototype effort (pursuant to 10 U.S.C. 2302 Section 804 and associated Navy Guidance for Middle Tier Acquisition Programs) - The following changes have been made: Systems Development start of H Build Integration changed from 4th Qtr. FY 2020 to 1st Qtr. FY 2020. Engineering Milestones System Functional Review - 2 moved from 2nd Qtr. FY 2022 to 4th Qtr. FY 2020. Engineering Milestones Preliminary Design Review moved from 4th Qtr. FY 2022 to 1st Qtr. FY 2021. Engineering Milestones System Readiness Review - 2 moved from 3rd Qtr. FY 2021 to 4th Qtr. FY 2020. Engineering Milestones System Readiness Review - 1/ System Functional Review - 1 moved from 1st Qtr. FY 2019 to 3rd Qtr. FY 2019.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Air Platforms
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Aircrafts
  • Asymmetric Warfare
  • Computational Fluid Dynamics
  • Contracts
  • Cost Analysis
  • Electromagnetic Spectra
  • Employment
  • Engineering
  • Frequency Bands
  • Product Development
  • Spectra
  • Systems Engineering
  • Tactical Aircraft
  • Test And Evaluation
  • Warfare
  • Wind Tunnels

Readers

  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Microelectronics

Related Documents