Surface Combatant Cmbt Sys Eng

Abstract

This project provides Cruiser & Destroyer ACS upgrades and integrates new equipment and systems to pace the threat and capture advances in technology. Examples of captured advanced technologies are: fiber optics, distributed architecture, and high performance computing, all of which require corresponding AWS and ACS changes. The ACS capabilities have continually evolved. Baseline (B/L) 2 (CG 52-58) introduced the Vertical Launching System, TOMAHAWK Weapon System, and Anti-Submarine Warfare upgrades. B/L 3 (CG 59-64) introduced the AN/SPY-1B Radar, AN/UYQ-21 consoles, and UYK-43 "low boy" computers. B/L 4 (CG 65-73) introduced the production of AN/UYK-43/44 computers with superset computer programs developed for the DDG 51. Baseline 5 was introduced in FY1992 DDGs included the Joint Tactical Information Distribution System (JTIDS) [Tactical Data Information Link (TADIL)16], Command and Control Processor (C2P), Combat Direction Finding, Tactical Data Information Exchange System, AN/SLQ-32 (V)3 Active Electronic Counter Countermeasures, and Aegis Extended Range (ER) Missile. B/L 5 was developed in two steps (Phases): Phase 1 integrated AEGIS ER and supported the missile Initial Operational Capability; Phase 3 integrated system upgrades including Defensive Electronic Attack, Track Load Control Algorithms, and Track Initiation Processor (integrated on 5.3, DDGs 68+); JTIDS and the OJ-663 color display Tactical Graphics capability into the ACS. B/L 5 Phase 3 is now resident on baseline 3 and 4 CGs and DDG 51-78. Baseline 6 Phase 1 introduced COTS, Fiber Distributed Data Interface (FDDI), Local Area Network (LAN), UYQ-70 consoles, Cooperative Engagement Capability (CEC) for CGs, and an adjunct COTS computer for AEGIS Display System (ADS). It supported OPEVAL of CEC in CGs 66 and 69 and was introduced in the DDG 51 class beginning with DDG 79. B/L 6 Phase 1 is now resident on CGs 59, 65, 66, 68, 69, and 71. B/L 6 Phase 3 was introduced on DDGs 85-90 and is being backfit onto DDGs 79-84. B/L 6 Phase 3 upgrades included embarked helicopters, Fiber Optics as applied to Data Multiplexing (FODMS), implementation of affordability initiatives, adjunct computers for all AWS elements, CEC for DDGs and Battle Force Tactical Trainer (BFTT), Advanced Display System, Evolved Sea Sparrow Missile (ESSM) Identification (ID) upgrades Phase 1, Advanced TOMAHAWK Weapon System (ATWCS) Phase II, Fire Control System Upgrades, and the Joint Maritime Command Information System (JMCIS). B/L 7 Phase 1 is installed in the DDG 51 class beginning with DDG 91-102 Major Baseline 7 upgrades include but are not limited to introduction and integration of new radar (AN/SPY-1D (V) upgrade), all UYK-43 and adjunct computers to be replaced with COTS-based advanced computer processing, AN/SQQ-89(V)15, and the Remote Mine Hunting System. B/L 7P1R (DDG 103-112) upgrades the computer infrastructure, Close In Weapon System (CIWS), Air Control, and introduced OA products into the main development line. The Modernization Baselines will provide new technology to replace aging military equipment and extend service life to provide viable combatant for naval use into the future. These baselines should reduce the life cycle costs to maintain combat systems and streamline the development of capabilities. Advanced Capability Build - 08 / Technical Insertion - 08 (ACB-08/TI-08)(Cruiser Modernization) Baseline consists of an upgraded computing infrastructure and computer program enhancements to existing warfighting capabilities on CG 52-58. Advanced Capability Build - 12 / Technical Insertion - 12 (ACB-12/TI-12) (AEGIS Modernization) baseline will consists of an upgraded computing infrastructure and computer program enhancements to provide increased warfighting capabilities which will modernize CG 59-73 and DDG 51-78. ACB-12 Destroyer upgrades will consist of Naval Integrated Fire Control with new computing architecture, upgraded display consoles, computer program enhancements and introduce Control - Common Air (NIFC-CA), Standard Missile-6 (SM-6), Common Display System (CDS), Common Processor System (CPS), Multi Mission Signal Processor (MMSP), and Ballistic Missile Defense (BMD). ACB-12 Cruiser Upgrades will consist of NIFC-CA, Standard Missile-6 (SM-6), Common Display System (CDS), and Common Processor System (CPS). Aegis Advanced Capability Build 14 (ACB14) will be limited to a combination of capabilities outlined in OPNAV's ACB14 Development Guidance Letter: Integration of MMSP for Baseline IV CG's, Aegis BMD, MH-60R, IFF Mode S, DWC, SEWIP BLK II, C5I updates, training and selected Small Business Innovation Research (SBIR).

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2011
Source ID
0604307N_5_1319_PB_2011
Change Summary Explanation
FY09SBIR/STTR Transfer-5.462 Program Adjustment 2.184 Total-3.278 FY10Congressional Add 5.600 Congressional Adjustment-0.784 Total 4.816 FY11 from previous President's Budget is shown as zero because no FY11-15 data was presented in President's Budget 2010.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Electronic Warfare
  • Ground and Sea Platforms
  • Materials and Manufacturing Processes
  • Weapons Technologies

DTIC Thesaurus Topics

  • Application Software
  • Computer Programs
  • Computers
  • Control Systems
  • Cooperative Engagement Capability
  • Display Systems
  • Engineering
  • Fire Control Systems
  • Local Area Networks
  • Naval Warfare
  • Navy
  • Systems Engineering
  • Test And Evaluation
  • Uss Arleigh Burke
  • Uss Bunker Hill
  • Uss John Finn
  • Warfare

Readers

  • Fire Suppression Systems Design.
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control
  • Microelectronics

Related Documents