Nav Integrated Fire Control - Counter Air Sys E
Abstract
PU 2757 All domain Long Range Networked Fires (LRNF) is a cross organizational Systems Engineering, Integration and Test (SEIT) project to coordinate and align the acquisition enterprise for the delivery of effective and interoperable long range kill chains. This effort will coordinate development and validation of all kill chain components across key enabler programs that include sensors, networks, transport architectures, radios, weapons, platforms, and combat systems across warfighting domains. The project will include joint architecture and Battle Management Command and Control (BMC2) development and maturation, including integration of the key enabler programs to optimize current and emerging capabilities across Navy and other mission partners. Development and execution of the LRNF integrated System of Systems (SoS) acquisition approach will prioritize nearer term fielding of effective capabilities, while continuing to mature solutions and informing investments across the portfolio. 3159 Naval Integrated Fire Control (NIFC) SEI&T project is a systems engineering effort to extend the Naval Integrated Air and Missile Defense battlespace out to the maximum kinematic range of our weapons for the air, surface, and strike warfare missions. This includes targets beyond the detection range of the shooter. The NIFC project exploits capabilities inherent in existing systems, optimizes current and emerging technologies in component system upgrades, integrates them together, and performs kill chain tests, forming an interoperable System of Systems (SoS) to maximize future defense capabilities. As directed by OPNAV, the project is focused on SEI&T efforts to integrate the From The Sea (FTS) family of kill chains which includes an elevated sensor, platform, fire control system, and missile, along with introducing other networks and sensors coordinating with other DOD activities as appropriate. Along with executing NIFC Inc 2 developmental test & fielding the SEIT supports the design of the current kill chain and system configuration and architectures. Future NIFC efforts (e.g. NIFC Inc 3) includes SEIT activities across a broad range of systems and architectures. 3242 Naval Integrated Fire Control (NIFC) From the Air (FTA) SEI&T project is a systems engineering effort to integrate NIFC FTA capabilities within "Pillar Programs" (F/A-18 & EA-18G, E-2D, F-35, Link-16 and Tactical Targeting Network Technology Data Links, and all USN air launched Air-to-Air and Air-to-Surface weapons). Based on the advancing threat, there remains an imperative to improve lethality, survivability and interoperability by extending the battlespace out to the maximum kinematic range of our weapons for the air, surface, and strike warfare missions. The NIFC FTA project leverages capabilities inherent in existing systems, optimizes current and emerging technologies in platform system upgrades, and integrates them together to form interoperable System of Systems (SoS) to maximize offensive and defensive FTA integrated capabilities. As directed from OPNAV, the project is focused on development of Air Warfare, Surface Warfare, and Strike Warfare FTA effects chains. This PU will support efforts that include decomposing SoS requirements into Mission Technical Baselines (MTBs) and Integrated Capability Technical Baselines (ICTBs) for requirement allocation to Pillar Programs. Additionally, this PU will support NIFC pillar program coordination to provide performance predictions, performance assessments, and SoS risk reduction activities through Live, Virtual, and Constructive (LVC) events, SoS exercises, and development of Requirements Test and Verification Matrices (RTVMs) to support Developmental and Operational Test for the individual platforms. In lieu of a traditional Test and Evaluation Master Plan (TEMP), NIFC FTA test strategies will be developed to identify resources required to evaluate NIFC FTA capabilities, and describe how NIFC FTA capabilities will be evaluated prior to fleet delivery. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2025
- Source ID
- 0604378N_5_1319_PB_2025
- Change Summary Explanation
- Funding: FY25: PE overall decrease of $28.907 million. 3242 $.188 million decrease for Rate/Misc adjustments. $13.800 million increase for Programmatic adjustment for CVW High Fidelity, Augmented Debrief and Analysis that was transferred in full (-13.800M) to PE 0204571N PU 3093. 2757 Decrease of $25.5 million from FY25 and out due to transfer of tasking/funding to PE 0605516N PU 2757 and PU 4046. 3159 Decrease of $3.219 million for Misc adjustments. Schedule: Removal of all CVW High Fidelity, Augmented Debrief & Analysis milestones from schedule. Technical: Removal of CVW High Fidelity, Augmented Debrief & Analysis
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: All Domain Long Range Naval Integrated Fire Control (LR-NIFC)
- Child Accomplishment: Development, Integration, and fielding of effective all domain Long Range Networked Fires.
- Child Cost Item: 63dd3d96a9e375f5c6840d38af928dad
- Child Cost Item: 655aaf7db558aa8870adc965ee115661
- Child Cost Item: c94416788de43bcfff2d8055f6e90d15
- Child Cost Item: 54ec42fa9e0f3f904032effbe4c4e051
- Child Cost Item: 7dcab14a739a1646b15b65c6448953e0
- Child Cost Item: 8db0ea42cc49a43ee104097986db388e
- Child Cost Item: c6a9920fbc6237924920d7c5316560b7
- Child Cost Item: 86338b2b4d3b5bc8f5d243b178f04ade
- Child Cost Item: 83f47c5f55fd0239df67ea683f07e350
- Child Cost Item: e26b8a64c5007ef3d1bfe1da1c3942bc
- Child Cost Item: 1220d679012d950e908ef4c9c812716d
- Child Cost Item: 8173aee767119b08b5c7bc506d8a2908
- Child Cost Item: 3b21d142faef281a00edd23183d0acf6
- Child Cost Item: 0cb16ffe1a8902a984b1db40295df01f
- Child Cost Item: fb2c408117099c791219769e658e6bc3
- Child Cost Item: ef1d1630046137ed8e29b7f019fbe245
- Child Cost Item: 12b87e6ef8bebbb4fc608c30b8dc7cc8
- Child Cost Item: f2cdd15e39f46ed49e96e4ca0cb1a2bd
- Child Cost Item: 360cde5ee0380211ca360810ce9c4ec7
- Child Project: Naval Integrated Fire Control-Counter Air SE&I
- Child Accomplishment: Integration and Test (I&T) Integrated Product Team (IPT)
- Child Accomplishment: Engineering Management And System Definition
- Child Cost Item: 6c67fbd5d65a63b8b399c7cd9173da7b
- Child Cost Item: 348087c30265505560631ef992fb5541
- Child Cost Item: d41d2dc73ce656871319df177134da5f
- Child Cost Item: bf7c8391e4ed6c85a0af0f09df827509
- Child Cost Item: 5be8585a037c063cb06b4666f2592e09
- Child Cost Item: 0f9085a8d9bfd0692761b1d67dca0393
- Child Cost Item: 51f3447062031a786792bb9fc03f3ce3
- Child Cost Item: 3534ec05271d02eedf71f5f3298b34c3
- Child Cost Item: 496b7b3812ba4e9c3f5cbecccd78dfba
- Child Cost Item: 5bbdc147a298ae51f004d0b02b34c181
- Child Cost Item: 8b2b0eee8b86576be8b6c257c8644038
- Child Cost Item: 288c2c62bcb3ab8439dd412d47300cf5
- Child Cost Item: 411a521baa48b894bcbf0e88f4752d57
- Child Cost Item: 9b66a3f97644c3c7a788042f16d103e5
- Child Cost Item: 61af20f738843682530ff6cc4c60f003
- Child Cost Item: 57ea060858d1f5922d1f688a11cecb60
- Child Cost Item: 6e14d1020eb02851d345cbdf6aa8556a
- Child Cost Item: bf5479754bd42d983ec32cc8fe450c25
- Child Cost Item: 8b68d993a59463bdd5470ea7e407cde5
- Child Cost Item: 975195e8c083ce1afbb902598c103ce5
- Child Cost Item: ff5ba5ecdaeb7549edda94150b056488
- Child Cost Item: 21d170798d13960d8d867cb4ae3b8072
- Child Cost Item: 8fad17d5537b1d2a9d9685a028c831b3
- Child Cost Item: 0539d374811352a614106b14f8c9ce10
- Child Cost Item: c0e0a3720df50d16aeae7e98778d81a8
- Child Cost Item: 2535e418aca5d7ed54854d3f9bb7406b
- Child Cost Item: 0f2bfaf28401a3059ef1d0fe3ccfaa6e
- Child Cost Item: 7edda77ee2515949feae55e8a5454340
- Child Cost Item: 3cefe51fcefb9a7e7a676d06746761d1
- Child Cost Item: b06b9b391c803d30850fd122069b8ace
- Child Cost Item: 22a5356328aae6f8b2614ed7f7717775
- Child Cost Item: 318b48cbc6712450c830086e84d09886
- Child Cost Item: 4588140c6f9522bf61953f8c45fdb226
- Child Cost Item: 8eed9bcac676543993a79d960818381c
- Child Cost Item: 1855305e6ad423529139414bb9ee5926
- Child Cost Item: 840cfe14351bc4c739f94663679b36c1
- Child Project: NIFC-CA Supported by Airborne Platforms
- Child Accomplishment: NIFC From the Air (FTA) Capabilities Effectiveness and Integration
- Child Cost Item: 1fe190f54d62a59d34dfe345a3fa97f6
- Child Cost Item: 5080a0b09b86601a4ee2c2a8f848c7bc
- Child Cost Item: a236087489ac77b5a91746a631347686
- Child Cost Item: 817e8626f1602a0332a59228861738fe
- Child Cost Item: e34a0c4afd42a385e7d00ffe3c9f1841
- Child Cost Item: bc1041bcc2589a01b5052952b7b86a93
- Child Cost Item: d305da32e4aee8cfdbee3726edc9a234
- Child Cost Item: 1a07375a7a89650a27441e063ca2d7d4
- Child Cost Item: 0061406ca9a46c1c8199cdd4c177cda3
- Child Cost Item: 7e3f6338878875ba1097b831787ea3fb
- Child Cost Item: f2c89aaf45624529f0ce812e470b5073
- Child Cost Item: 05ed8ea088259f61ca0f9e6d6519d7d7
- Child Cost Item: 2977bd95dd6d1c3c4778496695acb454