Air Control
Abstract
This program element provides for the development, integration, and testing of Automated Air Traffic Control (ATC) hardware and software required to provide improved flight safety and more reliable all-weather ATC and landing system capabilities at Naval Air Stations (NASs) and Marine Corps Air Stations (MCASs) and Fleet Area Control and Surveillance Facilities (FACSFAC) worldwide. Funded programs are required to upgrade or replace aging ATC and landing system equipment on aircraft, aircraft carriers, amphibious ships, NASs, MCASs and Navy/Marine Corps tactical/expeditionary airfields and remote landing sites. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2017
- Source ID
- 0604504N_5_1319_PB_2017
- Change Summary Explanation
- Funding: Decrease in Air Control by $1.989 million in FY 17 as required for the Department of the Navy to comply with the Bipartisan Budget Act of 2015. Funding: The FY 2017 funding request was reduced by $2.957 million to account for the availability of prior years execution balance. Funding: FY 2015 funding reduced to finance higher Department priority need. Schedule: 0718: The G/ATOR FY2015 efforts did not occur, it has delayed the contract award to 2nd Quarter FY2017. 0993: The Material Development Decision for AN/SPN-50(V)1 shifted from 2QFY2015 to 4QFY2015 directed by PEOT. Critical Design Review AN/SPN-50(V)1 for FY2017 was added to the FY2017 plans. 1657: The Fleet ATC Systems FY2015 efforts did not occur, all FY2015 funding was redirected to NASMOD VIDS efforts due to program priorities.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: MATCALS
- Child Accomplishment: ASPARCS Improvements
- Child Accomplishment: Ground/Air Task Oriented Radar System (G/ATOR) Block 4
- Child Cost Item: c93d5f3db746fa5838fc1ebb59ced245
- Child Cost Item: a180ca0849e58496007300bb937ed862
- Child Cost Item: fa93bd20c5113d9f4d627a1b4cffa450
- Child Cost Item: bd227f9ef31f327024b99b64656bc7d3
- Child Cost Item: d9d24cdd5c51cf4eedcf488ab084fa0a
- Child Cost Item: 8917ff235b79a2fdd77011477f69b11c
- Child Cost Item: f10cd07c512ef37393e3d154fe06aa8a
- Child Cost Item: a7e36208f1d0873420ac05e931ab4214
- Child Project: Carrier ATC
- Child Accomplishment: AN/SPN-50
- Child Accomplishment: AN/SPN-43C
- Child Accomplishment: AN/TPX-42
- Child Cost Item: ef06b269505ae51b83d1ce2f2a8159b4
- Child Cost Item: 6bbb9a1a1f6e28e585778cbd2ca6cc5f
- Child Cost Item: 5c44a74c11d3ec33e313029786bc0d1d
- Child Cost Item: 6b0706d89bb39695388f3b40cf6499e5
- Child Cost Item: 30ecb7e686db87075a326a0e172f5062
- Child Cost Item: f212f0b9da2e266379af28bd59c914ec
- Child Cost Item: 8d07d70a81c1b92a97abfb800582b111
- Child Cost Item: dc48d0dc55b1d3136549fbd36db11ec0
- Child Cost Item: bdc5b0d6e8e27748334e7450f535d715
- Child Cost Item: ef4836747fda2971de2e9125c8e85bea
- Child Cost Item: 0b7a1c37b5dc1f24e225aa0c4f535893
- Child Cost Item: cb76bdfe7635c4aa8ce3b6f527387a16
- Child Cost Item: 67d6a48fbfd3fc2a31e3af66779bc1d7
- Child Cost Item: d2efebb77d739326a8ca0f82a3014b4f
- Child Cost Item: f53ccb8078c80b3a7bb3740a97b17a46
- Child Cost Item: 2985d12f5728d8b5a764763b841ac283
- Child Cost Item: 9805667a1d068d1068b410e5e7106396
- Child Cost Item: 938ae9a97b4d264b12e025006fa66742
- Child Cost Item: 8a50b42a3393a9189c9f57997d602182
- Child Cost Item: 9a8bbbfa77288beeb0afebbd52d23fa9
- Child Cost Item: 9791d53bc08812469c899c216cb4fa4c
- Child Cost Item: c51ed0171f2539448d11ecb9a1c4380c
- Child Project: ATC Improvement
- Child Accomplishment: NAS MOD VIDS
- Child Accomplishment: Fleet ATC Systems
- Child Cost Item: d52bca64193e6c38822ebff78c077d78
- Child Cost Item: 24380f3f18b7ab2c0b87af580458f2b7
- Child Cost Item: 42ea48add9b61f4b322679df888499d1
- Child Project: ATC Systems
- Child Accomplishment: AN/SPN-46 Blk IV Upgrade
- Child Accomplishment: AN/SPN-35 Blk I Upgrade
- Child Cost Item: 3af2a29a4ca4638584c083f2b93983de
- Child Cost Item: d54e4a0b9807dcdbb273df30c1391fc1
- Child Cost Item: bc5027d8419d2341aff72e4239129e89
- Child Cost Item: 56056f2bfee3e9c0fe9e4c616cb7d32b
- Child Cost Item: 011c0c93bbca58247107dbdd37dad3f7
- Child Cost Item: 63ce5c702bf93ae69ff44905cc788f28
- Child Cost Item: 587184a116db585ff7a6fe5ef111f034
- Child Cost Item: 856c46baf979aaccf55ff335cfeafab8
- Child Cost Item: 7cc81a4896e89d77f378833929866cea