Air Control
Abstract
The FY 2019 funding request was reduced by $2.133 million in ATC Systems to account for the availability of prior year execution balances. This program element provides for the development, integration, and testing of Automated Air Traffic Control (ATC) hardware and software required to provide improved flight safety and more reliable all-weather ATC and landing system capabilities at Naval Air Stations (NASs) and Marine Corps Air Stations (MCASs) and Fleet Area Control and Surveillance Facilities (FACSFAC) worldwide. Funded programs are required to upgrade or replace aging ATC and landing system equipment on aircraft, aircraft carriers, amphibious ships, NASs, MCASs and Navy/Marine Corps tactical/expeditionary airfields and remote landing sites. These upgrades include addressing broadened CyberSecurity requirements to remain compliant with software CyberSecurity directives and Information Assurance mandates. Virtual Warfare Center (VWC) supports the Marine Air Ground Task Force (MAGTF) Integrated Air and Missile Defense (IAMD) development JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2019
- Source ID
- 0604504N_5_1319_PB_2019
- Change Summary Explanation
- 3372: Contract award (CA), Preliminary Design Review (PDR), Critical Design Review (CDR), and the beginning and time span of the AN/SPN-46 Blk V effort, were moved to reflect an updated development timeline. The new schedule takes into account changes identified by studies and analysis of the technical requirements, availability of resources, and refined cost estimates for the AN/SPN-46 Blk V upgrade. The FY 2019 funding request was reduced by $2.133 million to account for the availability of prior year execution balances. 0993: The AN/SPN-50 development schedule was updated to reflect the result of a 9 month, December 2015 to September 2016, delay to the award of the AN/SPN-50 development contract. SSR/PDR, CDR, Post PDR Review, Pre-CDR configurations, EDM deliveries, and O&M Training, were moved by two quarters. Updated O&M was moved three quarters. AN/SPN - 43 Test and Evaluation schedule for "System Deliveries" was added because of AN/SPN-43 ECP delivered to ships that require testing and evaluation to support the Fleet until SPN-50 is delivered.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: MATCALS
- Child Accomplishment: ASPARCS Improvements
- Child Accomplishment: Ground/Air Task Oriented Radar System (G/ATOR)
- Child Accomplishment: Virtual Warfare Center Support
- Child Cost Item: c0b1703bbf3770c8afd607e9ef1848a9
- Child Cost Item: 40447d306f3db7a683760fdfbfd676d8
- Child Cost Item: 4e9d895cda130179a23f87652806c6b9
- Child Cost Item: ce8bcfcb0713a936332f56438e333785
- Child Cost Item: d7298deb160a80f401c8bb7defd5facb
- Child Cost Item: 922e1934aecea6962b6cc81333b66075
- Child Cost Item: a242699e2eae2b4418eef085317ac7cc
- Child Cost Item: bfe08ff95586ef1bb54c4c9ed09de6c0
- Child Cost Item: d1aaf29e233807ed1b6a50b0fc5a6bf4
- Child Cost Item: eaa6ad747c1dbfc16a44a233001364bb
- Child Project: Carrier ATC
- Child Accomplishment: AN/SPN-50
- Child Accomplishment: AN/SPN-43C
- Child Accomplishment: AN/TPX-42
- Child Cost Item: a47bf31b958ed7f0878981119f7af081
- Child Cost Item: 2882664f295e3c53e290667583ef585c
- Child Cost Item: 54c13be83aac2a64d7ad37d04464052f
- Child Cost Item: 76b44318ac4f8e4b113b48ed15ef93a9
- Child Cost Item: a7849bf1c39c94a8992f2c3bd8a990d1
- Child Cost Item: b003f49fb7f04d429227f63bef9b50d6
- Child Cost Item: 5532455db910243c0c4724b3a00ed557
- Child Cost Item: ebae03923811ff242da3454baccc448a
- Child Cost Item: 5836456b7ededb6a3b6399cfc95a1467
- Child Cost Item: e925bdb09579e2629766c136db2376c8
- Child Cost Item: 132230230db40d3244397127184ccfd6
- Child Cost Item: 9017ffeec053debc3dfc0f92f451959b
- Child Cost Item: c74157aa12cda91e3ed9544182ced3e3
- Child Cost Item: 73def4aeb9cfae9ef6fe7d677aebe9f7
- Child Cost Item: b2191041378dbf33a125998b57172a58
- Child Cost Item: bd65428397df40d64e4f8efeca374f41
- Child Cost Item: e8616ce4e112b2f21534893e57c7c226
- Child Cost Item: a1b222bb0a24dcf1ba70cd5212213f8f
- Child Cost Item: 823dc5d00a02a5350d9d234e98a3a5ea
- Child Cost Item: 3b718532307cec1c6613c59a73012890
- Child Cost Item: f853cee8671b8a7bd1374952c7a56fe2
- Child Cost Item: 4305af7e59092807d001b66bae3e5046
- Child Cost Item: 111e365481a39aca9ab8068efc19ae3f
- Child Cost Item: 55814e0d182e277b8b4c18926139ba62
- Child Cost Item: c4275a230008a81af5a72736dbbed402
- Child Project: ATC Improvement
- Child Accomplishment: NAS MOD VIDS
- Child Accomplishment: Fleet ATC Systems
- Child Cost Item: 32db327d0cbb3da3b15878dcb91c8a2c
- Child Cost Item: 7b61595b2fb1524bb349a0638bf61ae6
- Child Cost Item: 99f052fc3f22b3d9c1f40f333f7f3133
- Child Project: ATC Systems
- Child Accomplishment: AN/SPN-46 Blk IV Upgrade
- Child Accomplishment: AN/SPN-35 Blk I Upgrade
- Child Accomplishment: AN/SPN-46 Block V Upgrade
- Child Cost Item: b598fb6991b8d2cee0e352662fefebaa
- Child Cost Item: 57786232e5ae3cdb689504674d8f8a8e
- Child Cost Item: f028121952ad74c790b854b097182522
- Child Cost Item: 0b66baeba7a9236f7f26a87a8f427cf2
- Child Cost Item: b62f1a37e61c1166a877ade090e751a5
- Child Cost Item: 340ff86a0285b0ac85f58658e50e4726
- Child Cost Item: 16748c8a1ab5334d42c2ba7aed7f0b4f
- Child Cost Item: 76e63e2b63e4dfeb0dff3f8566df3db7
- Child Cost Item: 7f3573ab53d6a9c6788d89e0675031c6
- Child Cost Item: bb1492d7cad18f17ef050d6fe83146b5
- Child Cost Item: 5bd81697bae78da921d4e62d0100b878
- Child Cost Item: 6577c987aec02d35753e8876bfbc67a3