Combat Information Center Conv
Abstract
The objective of this Program Element (PE), under Project 3094, is to provide capabilities to shorten command and control (C2) decision processes for detection-to-engagement across multiple platforms, including those with low-bandwidth communications or intermittent connectivity. The Undersea Warfare Decision Support System (USW-DSS) decision support tool uses a Service Orientated Architecture (SOA) encompassing existing communication links, networks, and contact pictures comprised of sensor data from air, surface, submarine, theater, and surveillance platforms to connect sensors and weapons. The capabilities delivered by USW-DSS are critical not only for the Sea Combat Commander (SCC) but also for the Theater USW Commander (TUSWC) and Anti Submarine Warfare Commander (ASWC) to fulfill the requirement for an integrated capability to plan, conduct, and coordinate USW operations across multiple ASW platforms. USW-DSS will provide common and improved visualization, integrated USW platform sensor data sharing, reduced data entry, improved sensor performance predictions, data fusion, and reduced redundancy across USW Tactical Decision Aids (TDA). The program will provide a greater understanding of the undersea battle space by allowing the entire force (carrier/expeditionary strike group, theater, or other) to have a common and thorough understanding of the battle space with characterized uncertainties. USW-DSS Build 2 will be hosted on the Integrated Shipboard Network System (ISNS) as one of the first Early Adopters, leveraging initial Service Oriented Architecture (SOA) Reference Implementation. USW-DSS will be hosted on the Consolidated Afloat Networks and Enterprise Services (CANES) architecture, which will be fully SOA enabled. Build 2 Release 3 (B2R3), in response to Fleet requests, will provide improved and additional functionality and increased stability/reliability.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2014
- Source ID
- 0604518N_5_1319_PB_2014
- Change Summary Explanation
- Technical: Not applicable. Schedule: Due to a reprioritization of requirements based on results of the Resources, Requirements Review Board (R3B) and the Sponsor's Program Proposal (SPP), USW-DSS will enter the sustainment phase after operational test and evaluation events in early FY13. USW-DSS B2R3 will provide an incremental update of Build 2 to field as much capability to the Fleet as possible.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: USW Decision Support
- Child Accomplishment: USW-DSS Build 2 Development / Integration
- Child Accomplishment: USW-DSS Build 2 Release 3 DT / OT
- Child Cost Item: 9adb624d98e89c090009f58f2853361d
- Child Cost Item: b4388299f1e83cf1dfcc83fc2dee1fac
- Child Cost Item: 530df37922612ddf2931c71692bce31e
- Child Cost Item: 7bd79b77397a99f0787b2cfd3a403838
- Child Cost Item: 4d3885d85967c68db941618863d29f63
- Child Cost Item: 07aef16620a0362ef4df4b80aa6861d7
- Child Cost Item: a6c03463e3fd35c2695942eabb556a5a
- Child Cost Item: 8d548a45ad5bd1db3f7760406499a1e0
- Child Cost Item: 2419408a87566468e248a9575ef12eec
- Child Cost Item: 6c4ca2087ed291767ae1a396d2f97353
- Child Cost Item: 8e4784b38190a50d36c637046cd54868
- Child Cost Item: 9bee42fea214224b9a6328371be36510
- Child Cost Item: d8c77cfe930cbab3f14a186a65b8f71c
- Child Cost Item: 86b1f7ccfac691962b173348f81f8da6
- Child Cost Item: 243c294c77d8104a3476a0526096f36c