(U)Advanced Arresting Gear (AAG)
Abstract
The Advanced Arresting Gear (AAG) program designs, develops, tests and fields an aircraft arrestment system to replace the legacy Mark 7 arresting gear. AAG systems will be installed on all new construction aircraft carriers. AAG will provide the U.S. Navy with improved operational capability, while reducing operating and support costs. The AAG system will recover all existing and projected carrier based tail hook-equipped air vehicles well into the 21st century. This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2020
- Source ID
- 0604530N_5_1319_PB_2020
- Change Summary Explanation
- Technical: AAG established in its own Program Element and Project Unit in FY19 and out. The Department reduced funding in FY 2020 by $23.945M for Full Envelope Testing and 3 Engine NRE. Schedule updated to reflect these changes. Cost: N/A Schedule: Updates include, - The Schoolhouse Curriculum Training Start date shift from 4QFY19 to 1QFY19 - Correction of Deficiencies efforts in FY20-21 - Addition of Software J1 Regression Testing in 1QFY20, J2 Software Regression Testing in 3QFY20 and Software K Regression Testing in 4QFY20 Software Release K moved from 1QFY20 and 3QFY30 to 3QFY20 and 4QFY20 Software Release I added in 2QFY19 T-45 JCTS testing start date moved from 1QFY20 to 3QFY19 E2/C2 RALS testing end date moved 3QFY18 to 2QFY19 F/A 18 E/F/G testing end date moved 4QFY18 to 1QFY19 Hi/Lo Operating Temp moved 1QFY20 to 2QFY21 RS 105 EMP moved from 3QFY20 to 3QFY21 CVN78 Events were updated to reflect the most current Post Delivery Test & Trials (PDT&T) schedule from PMS378.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Advanced Arresting Gear
- Child Accomplishment: Advanced Arresting Gear (AAG) Primary Hardware Development
- Child Accomplishment: Advanced Arresting Gear Test & Evaluation
- Child Accomplishment: Advanced Arresting Gear Depot Planning
- Child Accomplishment: Advanced Arresting Gear Software Support Activity (SSA)
- Child Accomplishment: Advanced Arresting Gear Training
- Child Cost Item: 6b5f0d370bb0aad57a3c8901b0592119
- Child Cost Item: 8c5a303871bef7e582eb10172b49bfe5
- Child Cost Item: de8f02986edfd68a6afc9d1676dcdab1
- Child Cost Item: 91eeb27f7012fd3be5b945e02bd3c0a5
- Child Cost Item: ac0afd8d9563010bd9aecfcae0c10823
- Child Cost Item: 1515632d34a2cd8644257783155d36f6
- Child Cost Item: 99364be906675b929e39ae70399de58e
- Child Cost Item: 359b7682586c3e449f3deaf8787d9684
- Child Cost Item: 52ca0c77a6fa58bf46f812cf7b94e313
- Child Cost Item: 9bfb86b5af372e0047db88479c899192
- Child Cost Item: fcfa89c0282f87c9d4c77fcda7ee4914
- Child Cost Item: f2de6ec4c2a4a5ab9c16d54a59d8d038
- Child Cost Item: e8f5b07b806e585370adc2f163d24598
- Child Cost Item: bccd476cc9c5e6db635b1bda556bf82c
- Child Cost Item: 4dface018af4c720001b5e32b05466fa
- Child Cost Item: 9327bc8da0863020da59787547d5bcf0
- Child Cost Item: cfeb635bed1feac7740f3087bb00d689