New Design SSN
Abstract
FY 2024 funding provides for the continued execution of Virginia Class Submarine Undersea Dominance Payload Integration (UDPI) (i.e., Advanced Payloads), Advanced Acoustic Sensors, and future blocks concept designs. FY 2024 will support the evaluation and development of capabilities/technologies for inclusion in the Virginia Class Block VI technical baseline. Funds will be executed at the Virginia Class design yard and numerous sub-vendors and warfare centers designing and developing critical, complex ship components necessary for integrating advanced Block VI capabilities into the baseline class design. FY 2024 decreases in Proj 1947 reflect the reprioritization of design efforts supporting future undersea warfare capabilities and the planned transition of effort from design to construction. The U.S. Navy must maintain a submarine fleet that is of sufficient capability and numbers to defend American interests. The VIRGINIA Class Submarine, formerly the New Attack Submarine (New SSN), is being designed to fulfill this need. It will counter potential threats in a multi- mission capable submarine that has the ability to provide covert, sustained combat presence in denied waters. The primary goal of the program is to develop an affordable yet capable submarine by evaluating a broad range of system and technology alternatives, and pursuing significant capability and improved performance enhancements while managing technical risk. This Program Element (PE) provides the technology, prototype components, and systems engineering needed to design and construct the VIRGINIA Class Submarine and build its Hull, Mechanical and Electrical (HM&E) systems and Command, Control, Communications, and Intelligence (C3I) System. This PE directly supports the following VIRGINIA Class Submarine missions: (1) covert strike warfare (STRIKE); (2) anti-submarine warfare (ASW); (3) covert intelligence collection/surveillance (ISR), indication and warning (I&W), and electronic warfare (EW); (4) anti-surface ship warfare (ASUW); (5) special warfare; (6) covert mine warfare; and (7) battle group support.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2024
- Source ID
- 0604558N_5_1319_PB_2024
- Change Summary Explanation
- The FY 2024 decrease accounts for the reprioritization of design efforts to properly align funds to the Submarine In Service program for investment in early battery failure mitigations for operational submarines. Additionally, this decrease reflects the planned transition of effort from design to construction.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: New Design SSN HM&E
- Child Accomplishment: New Design SSN HM&E
- Child Accomplishment: TEST AND EVALUATION
- Child Cost Item: e3eda3d4afdf4267bce42308fcd6c89e
- Child Cost Item: dcd355d27da06292f6f7a4c85d34d28a
- Child Cost Item: 704d1ca94a3364ccdea91c0c355885b3
- Child Cost Item: 4061b0fbb2c476c0500de8fa3a89694c
- Child Cost Item: 700a08a44636e5bf64e599a2143b3884
- Child Cost Item: eb5bf6ba6a76b7d4d9e5b1292e4f941c
- Child Cost Item: a1f90c7a8f87c107c34827a230922479
- Child Cost Item: fc2f6500c1bb72cee8064e084f121e5b
- Child Cost Item: 0c64e3a2651fec33e5f7491d51c7fcd9
- Child Cost Item: 8e6ba3d1f1063e53213d452447d4d088
- Child Cost Item: 18d690147681255e1e52d8244509dcee
- Child Cost Item: 7a20e7b61b799ae3880c45bdb18b00b6
- Child Cost Item: 983fe28a6ebda442641329319060b616
- Child Cost Item: 5e1dbe4261819e47b245a0697e616492
- Child Cost Item: a09273309373cafcbd95c1311b2ec7ad
- Child Project: New Design SSN Combat Sys Dev
- Child Accomplishment: Sonar, Combat Control, and Architecture (S/CC/A) Subsystems
- Child Accomplishment: C3I Systems Engineering
- Child Cost Item: 6b74cd7c4ddcff466b3669850de1be38
- Child Cost Item: 3fb6e1d4f7f9bdec252e2dd02b2c1d29
- Child Cost Item: b9333ae558a00a998b7adaba63965a28
- Child Cost Item: eeaec37c76cab5e191812cf8a5db61a7
- Child Cost Item: b7f445dc88b2ede378d8559e89316aa4
- Child Cost Item: 172984affa7560068cca7478bb2fa68d
- Child Cost Item: 1c663e369c708d77d40317304378f9e1
- Child Cost Item: a63ff274a122659d90046a4c5390f938
- Child Cost Item: 2a139fae12829ba79475bb25e5e54dcf
- Child Cost Item: fe0f779e223b7c83a3c62d4d90a8f1d1
- Child Cost Item: d64a08b788794f809ada60e8c15ccca0
- Child Cost Item: c66c648a26da02cf71c9e2a07bc94a0f
- Child Cost Item: 0cd6f061dd362c3329ba109d98e417e8
- Child Cost Item: 3bc33bdf4ccb01647e030d21080693c7
- Child Cost Item: 78e93bfc6923ea703a4380668cefa366
- Child Cost Item: 44692187744dcc9d10c7cf1825b30896
- Child Project: Submarine Multi-Mission Team Trainer
- Child Accomplishment: Submarine Multi-Mission Team Trainer
- Child Cost Item: ed8c77ed4b1037fcba0e5f92e41dd41d
- Child Cost Item: 5545ef71e4bd5c66b28cbb6e949c41d6
- Child Cost Item: cf421392c50ff3a919f9763c56c0501a
- Child Cost Item: 552895939e1702dabdf58d044229e4fc
- Child Project: Congressional Adds
- Child Cost Item: dc7917689f06b677cdbce453f4e96391