Submarine Tactical Warfare System
Abstract
Project Unit 0236: This program develops Commercial-Off-The-Shelf (COTS) based software and hardware upgrades to integrate improved tactical and weapons control capabilities for multiple submarine Classes (SSN-688, SSGN, SEAWOLF, SSBN and VIRGINIA (Post Shakedown Availability)). The AN/BYG-1 is the combat control system common across submarine platforms which incorporates tactical control, payload control, and tactical Local Area Network (LAN) functions into a single development program. AN/BYG-1 allows the submarine to rapidly update the ship safety tactical picture, integrate the common tactical picture into the battlegroup, improve torpedo interfaces, and provide Tactical TOMAHAWK (TOMAHAWK Block IV) capability. The hardware upgrades, Technology Insertions (TI) are developed on a biennial basis to provide improved capability and address COTS obsolescence. Funding also accommodates the biennial integration of software Advanced Processing Builds (APB) for both tactical control (APB(T)) and payload control (APB(P)) subsystems. The tactical control integration effort incorporates the integration of other sensor (ESM, sonar, radar, etc.) inputs to provide a common operational picture and improved situational awareness in an information assurance (IA) compliant environment. The Weapon Control development effort described in PB-16 has been renamed Payload Control to account for non-weaponized unmanned vehicles. The payload control development effort provides improvements to the payloads control subsystem based on improvements to missiles and torpedoes as well as development of a modernized Payload Control System (PCS) architecture to support various payload such as, but not limited to, Modular Undersea Heavyweight Vehicle (MUHV), Unmanned Undersea Vehicles, Unmanned Aerial Systems (UAS), torpedoes, and Sub Launched Mobile Mines (SLMM). Provides funding for the development of Payloads Launch System, Multi-tube Weapons System (MTWS), Information Assurance (IA) system, Onboard Team Trainer (OBTT), and Command, Control, Computer and Intelligence Maintenance Tool (C3IMT).
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2017
- Source ID
- 0604562N_5_1319_PB_2017
- Change Summary Explanation
- Decrease in Submarine Tactical Warfare System RDTEN by $1.802M as required for the Department of the Navy to comply with the Bipartisan Budget Act of 2015. The FY 2017 funding request was reduced by $2.266 million to account for the availability of prior years execution balance. Increased FY17-FY19 funding due to Unmanned Aerial System (UAS)
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: SSN Comb Cont Sys Imprvmnt (ENG)
- Child Accomplishment: Advanced Processing Builds
- Child Accomplishment: AN/BYG-1 TI-14
- Child Accomplishment: AN/BYG-1 TI-16
- Child Accomplishment: AN/BYG-1 TI-18
- Child Accomplishment: Payload Control System Upgrade
- Child Accomplishment: Testing
- Child Accomplishment: Information Assurance (IA)
- Child Accomplishment: Unmanned Aerial System (UAS)
- Child Cost Item: 88fadd8810ac2bb0025a1d42e913309e
- Child Cost Item: fed40e87768f6d35220ffbbe03c54704
- Child Cost Item: 7ce92082be66e998a60b3380411317bf
- Child Cost Item: 24b9711f3043b3aba317cc0d93c9ebbb
- Child Cost Item: 4178397616b6337e592d95163ed7b32e
- Child Cost Item: 9bfe3b306430ad97af4fbab9ded101ff
- Child Cost Item: 1e84aa23e7ddcf44ba97ff89737f82a6
- Child Cost Item: 6fc7e3693c271500de3f01973a6b3a3e
- Child Cost Item: 5058eca0d5b978ad4582e8412f167202
- Child Cost Item: 37ccd39b50d29daee94571020bea67b9
- Child Cost Item: a33476f6c25c4d5e64ebb548f6c05a4e
- Child Cost Item: aa61772cc9ac1f2790ef50e27af588ad
- Child Cost Item: 3802527af924d7dc1f553fde1e82778a
- Child Cost Item: 15291e87f176e764eb10e88e1820ce03
- Child Cost Item: b1d5cc5907a5000c577bde8611e18815
- Child Cost Item: 57da203f65bb072c33759c295bc6155d
- Child Cost Item: 284578f599ba1e7b51b97e065c42d9f7
- Child Cost Item: 6a925f1b50f7f338b8900d07d2c37077
- Child Cost Item: 8731db656ccdcca1b3c28e88ea55ff14
- Child Project: Congressional Adds
- Child Cost Item: 73fdd0c0bea7d24e0ff21d5e102cd63e
- Child Cost Item: 517ce81d2ac38f63d59e4ab7c8e1a506
- Child Cost Item: 093bfceb7a27c97dc963b4bebd35b68f
- Child Cost Item: efc433aaafbdd6fd80048eda3f26f6c8
- Child Cost Item: 8db6edf269401d87f1b2971870793e4c
- Child Cost Item: 585e2b5536244c03816fd34b8b125b0e
- Child Cost Item: 750a1ac19f4a78a82ef4807c0558d00c