Ship Contract Design/ Live Fire T&E

Abstract

This Program Element (PE) directly supports the Navy's Shipbuilding Plan by providing for the development of engineering, programmatic and acquisition documentation including ship specifications (including performance specifications) and contractual documentation associated with acquisition of Navy ships. This PE also supports the Congressionally mandated Live Fire Test and Evaluation (LFT&E) program for new ship designs. Contract Design has traditionally been the engineering development of the technical and contractual definition of the ship design (including ship specifications and drawings) to a level of detail sufficient for shipbuilders to make a sound estimate of the construction cost and schedule. Additionally, the contract design package developed under this PE has provided the technical baseline from which the Navy selects the shipbuilder who then develops the detail design package required to support the construction and eventual delivery of the ship. This PE also supports the development of design methodologies/tools which facilitate and optimize the transition from ship design documents to efficient production of new ships and ship conversions, and supports engineering planning and ship affordability studies. Under Acquisition Reform for new design ships, traditional distinct phasing of the design process has been replaced with a continuous concurrent engineering Integrated Product and Process Development (IPPD) process extending through and after contract award. This serves to maintain the focus of multi-discipline teams consisting of the government, shipbuilder, system programs, and suppliers. Government/Industry Integrated Product Team(s) (IPTs) will utilize the IPPD process to develop the design in an Integrated Product and Data Environment (IPDE). The design approach is part of an acquisition strategy that is based on commercial practices and incorporates a phased technical definition.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2018
Source ID
0604567N_5_1319_PB_2018
Change Summary Explanation
FY17: PROJ 3369: $1.691M removed from Hybrid Electric Drive (HED) to offset Navy FY17 request for additional appropriations. FY18: PROJ 3369: $1.503M removed from Hybrid Electric Drive (HED) due to reduced effort. PROJ 3374: $0 in FY18 reflects reestablishment of the National Defense Sealift Fund (NDSF) Appropriation (BA 04 PE 0408042N, Project 3110 (Maritime Prepositioning Force (Future).
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Aircraft Carriers
  • Aircrafts
  • Amphibious Assault Ships
  • Amphibious Operations
  • Control Systems
  • Cost Analysis
  • Cvn-79 Uss John F. Kennedy
  • Cybersecurity
  • Developmental Tests
  • Logistics
  • Navy
  • Performance Tests
  • Procurement
  • System Software
  • Test And Evaluation
  • Uss Gerald R. Ford
  • Vulnerability

Fields of Study

  • Engineering

Readers

  • Defense Acquisition Program Management
  • Maritime and Naval Warfare Studies
  • Software Engineering

Related Documents