(U)Precision Strike Weapons Development Program
Abstract
Initial and continuing development of strike weapons consisting of armament, munitions, and weapon subsystems to allow for the horizontal integration among current and future weapon system capabilities to provide enhanced anti-surface and land strike capabilities in a demanding Anti-Access Area-Denial environment. This program provides for the development of weapon and weapon system technologies to address future requirements for enhanced and alternative weapon system capability requirements that include selectable output weapons, low collateral damage weapons, precision lethality weapons, area weapons, alternative warhead technology, Insenstive Munitions (IM), scaled munitions, DoD fuzing systems, sensors, extended range weapons and precision guided training round technology. The Precision Strike Weapons Development Program Element (PE) provides funding for the Next Generation Strike Capability (NGSC) that includes a survivable, long range, multi-mission, multi-platform conventional strike capability by 2024. NGSC will combine the current maritime (OASuW Increment II under PE 0604786N and Project 3343) and Land Attack (NGLAW under PE 0204229N and Project 3378) projects into a single, Multi-Mission development effort as the acquisition follow-on program to the current maritime (OASuW Increment I/LRASM) and Land Strike (Tomahawk Modernization) investments. NGSC will focus on assessing, maturing and incorporating emergent technologies to determine the best path for the follow-on improved land/maritime strike capability effort. This program is funded under ADVANCED COMPONENT DEVELOPMENT AND PROTOTYPES because it includes all efforts necessary to evaluate integrated technologies, representative models or prototype systems in a high fidelity and realistic operating environment.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2016
- Source ID
- 0604659N_4_1319_PB_2016
- Change Summary Explanation
- Schedule: PU 3378 System Readiness Review acquisition milestone added 3Q 2017 Material Solution Analysis added 1Q 2016-4Q 2018 Milestone B moved to 4th Qtr FY18 Preliminary Design Review moved to 2nd Qtr FY19 Critical Design Review acquisition milestone added 2Q 2018 Engineering, Manufacturing, and Development Phase acquisition milestone added 1Q FY19 to 4Q FY20 Schedule: PU 3214 MS C is now planned for 2nd QTR FY15 due to delays in the Air Force testing. Technical: Not applicable The FY 2016 funding request was reduced by $405 thousand to account for the availability of prior year execution balances.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Fuze Development Program
- Child Accomplishment: Hard Target Void Sensing Fuze (HTVSF) Hardware Development
- Child Cost Item: 4251afad1f5944e9361475467bd45244
- Child Cost Item: cc05a60d8eb6072c78d670fad9d3f460
- Child Cost Item: 8ce38f0b4f1b8439cda9179c86d8d18c
- Child Cost Item: be10e18ce8a56242eaf681f0d238b5bc
- Child Cost Item: f980d583e53ce07fad7f75cfcd599cd3
- Child Cost Item: e1825bb412fc0e82a227b53251d64393
- Child Cost Item: 3d4cf2e814b589368c859737583dc71d
- Child Cost Item: 632e4b8051b531aaa60dfb56e2a1e59c
- Child Cost Item: ee112036d489a94e3e01027094cfc811
- Child Cost Item: 2c67737051816acc2b11f2f225c4d4ee
- Child Cost Item: b1839028136bfa1c2999bff438a225c9
- Child Cost Item: 487b6ef65f28f4eb01c4748951076b35
- Child Project: Next Generation Land Attack Weapon (NGLAW)
- Child Accomplishment: Next Generation Strike Capability
- Child Cost Item: e193ffc24b146c2baef15991df9f2a43
- Child Cost Item: 3491f43ac7810d0187a7483898e69775
- Child Cost Item: c56426f24475f706730b2df64fe8caa2