Ship Self Def (Engage: Hard Kill)
Abstract
This program element provides funding for the development of systems that fulfill a portion of the third phase of the Ship Self Defense: Engage Hard Kill. Development in this line will focus on hard kill capabilities in which missiles are used to intercept incoming Anti-Ship Cruise Missiles (ASCM). Missile and system improvements necessary to meet their requirements are being addressed via NATO SEASPARROW Missile System (NSSMS) (0173), Rolling Airframe Missile (RAM) (0167), Advanced Low Cost Munition Ordnance (ALaMO), Phalanx Close-In Weapon System (CIWS) SeaRAM (9081), Griffin, Javelin and Spike Missile (3342). Missile improvements include improved kinematic performance plus advanced seeker and low elevation fusing/warhead capability improvements. CIWS System improvements include Technology Refresh for current fleet population and Next Generation CIWS for the future fleet. New system developments include integration of Griffin missile into Patrol Coastal (PC) and Littoral Combat Ship Missile Module, and development and/or qualification of shoulder launched missile system. ALaMo (0243) qualifies a guided 57mm projectile with an active seeker for United States Navy (USN) use. ALaMo provides enhanced lethality against Fast In-shore Attack Craft (FIAC) when compared to existing 57mm ammunition.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2017
- Source ID
- 0604756N_5_1319_PB_2017
- Change Summary Explanation
- Decrease in Ship Self Defense (Engage: Hard Kill) by $4.939M as required for the Department of the Navy to comply with the Bipartisan Budget Act of 2015. FY15 funding decrease due to SBIR/STTR Transfer. FY16-FY18 funding increase for RAM supports the implementation of RAM changes identified in the Integrated Combat System Failure Review Board (CSFRB) report known as the Fire Control Loop Improvement Project (FCLIP). These funds support RAM systems engineering, design analysis and testing of the combat system in support of the FCLIP process. Funding will deliver software baseline changes to the RAM Block 2 missiles, launcher software updates and updated interface to the combat system. FY16-FY17 funding increase for NATO Sea Sparrow supports ramping up to full E&MD effort in preparation for ESSM Block 2 Testing and ESSM Block 2 Production in accordance with supporting the U.S. share of costs under the Block 2 E&MD MOU. Specific efforts include: Maturation of the ESSM Blk2 design during the EMD phase of the program focusing on Software and Hardware development as well as preparation for Milestone C. FY17-FY20 funding increase for RAM supports the implementation of RAM BLK 2+ with Ship Self Defense System (SSDS) combat system improvement efforts that are key to air defense survivability. This issue completes the Fire Control Loop Improvement (FCLIP) developmental efforts and installs FCLIP fixes onto the ships. Addresses current capability gaps to improve overall Probability of Raid Annihilation (PRA) as identified during Failure Review Board (FRB) following A5-1 test event. Funding closes these gaps by implementing FRB-identified fixes which improve PRA. Changes to RAM Initial Operational Test and Evaluation (IOT&E) milestones which also impact the planned Full Rate Production (FRP) Decision have been driven by the following: All flight testing was disrupted a national moratorium on usage of BQM targets imposed after the 16 November 2013 testing incident where a BQM-74 drone impacted USS Chancellorsville (CG 62). RAM flight testing was reinstated in June 2014. In addition to the BQM flight test moratorium, a successful demonstration of Combat System (CS) enhancements, implemented as a result of the Fire Control Loop Improvement Project (FCLIP) was required to ensure proper RAM designation for stream raid engagement. IT-C2 is comprised of three test events: G,I and J. Test events G and I were completed in FY15 2nd Quarter. The final live-fire event, ET05J, a combined IWS Enterprise test event, has been moved to the right to align to another required element program's schedule. This delay has caused the final RAM IOT&E (OT-C5) LHA 6 PRA Testbed Event to slide to the right impacting RAM FRP decision.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: 5in Rolling Airframe Missile
- Child Accomplishment: Rolling Airframe Missile Block 2 Development and Test
- Child Accomplishment: Rolling Airframe Missile Block 2 Travel
- Child Cost Item: 468321c36fec3dc083bdf917bf09f24d
- Child Cost Item: bb9ee9db8b938fc6a6563d0fef01677d
- Child Cost Item: b5105ffd646655fced9179f50014c3ab
- Child Cost Item: 9aedb4c69fbdffa417eb26e96cdb9580
- Child Cost Item: e9b8ed8a4b569424f3c853e38b4539fb
- Child Cost Item: 0721fac4c7b9064009514174be4c8f23
- Child Cost Item: 5f83b4abdf5defa9691934c09b147058
- Child Cost Item: 9ebe4e5a573f6e1a6a569af123a6ced6
- Child Cost Item: 6cedc2d2b768aae8f2fc8074e8328dd2
- Child Cost Item: 702fe377870bb77cbf3778dc3abb7b45
- Child Cost Item: f779ea7fff988971d9d7b2e9e68411b4
- Child Cost Item: 99c2529884b4e07e706dd9e0d66eacb0
- Child Cost Item: fc6a3461deb15054496e68965536c0f7
- Child Cost Item: c59be8862267c3d1604950196ee1b745
- Child Cost Item: 7ceedbf9797eb4e7de2dc547f40628a2
- Child Project: NATO Sea Sparrow
- Child Accomplishment: Evolved SEASPARROW Missile (ESSM) testing
- Child Accomplishment: NATO Sea Sparrow Combat System Integraton Technical Direction Agent (TDA)
- Child Accomplishment: Evolved SEASPARROW Blk 2 Risk Reduction/ESSM Blk 2 E&MD
- Child Accomplishment: Dual Band Transceiver (DBT)
- Child Cost Item: 841eb85bba326a02484d38fd13589f7e
- Child Cost Item: 33c2106be626f84db02929717bd63efe
- Child Cost Item: d8a2110af6601d9fd1cde1d00ac0c76f
- Child Cost Item: 16a1337ee2886c35ace8c9ed795a61ef
- Child Cost Item: 7d3416d29fe50f9f2a4f3c90536c4a6d
- Child Cost Item: 73d65800adb05a9f2522c59d4ab173e7
- Child Cost Item: 1a16ba9da3f52b5cfc19278cd4fa441c
- Child Cost Item: 94c5f2b35a20380bac2c75dceaacd633
- Child Cost Item: 063d11068afe7c788fe192c26da10c06
- Child Cost Item: 124c085e33d7c1a74846846e8e71aec0
- Child Cost Item: 18b0511c3d6aea64cf1b5c8e12e7ad72
- Child Cost Item: 8159a03f526dc1ad84d59cc5ab034b0b
- Child Cost Item: 97639107f2e3fbc5573ddf7a979e0412
- Child Cost Item: a3a492bb31fd353cac406eb6b162a8f2
- Child Cost Item: 35aef70ba9a684015637a63373657e60
- Child Cost Item: b6bec2c58a5c13feb22673f8e0289b81
- Child Cost Item: d23efc0f40acf5d4758d27b3974fbe4b
- Child Cost Item: f20741b5d873629468a4bc8a3e931ea9
- Child Cost Item: 682ecad67500803a31467a9372ca81db
- Child Cost Item: 1ed04899caf7b643c10d8550ab37c80a
- Child Cost Item: cc2c07f53114b8204d374e7619f5f78a
- Child Cost Item: e0bdfe84e3b3358fb5e9428cc9f0535a
- Child Cost Item: 415a80181d1f5364e09e57f91ce3b248
- Child Cost Item: 8abfcc6c9f0822ce9df65a28e72ca8c8
- Child Cost Item: 5b4c5a0552b7fe4ae7f77bb03f17c348
- Child Cost Item: a132cc7ad79552fbd7d97d89fe654564
- Child Cost Item: e97f5484257d2479635da9409f81d076
- Child Cost Item: 7779776fa6883fd5202eeb91e8ac2742
- Child Cost Item: f345a86267ee4697d0ade21afdca2b7e
- Child Cost Item: 34939757a16b765a34617c2a4231dc53
- Child Cost Item: eed6ffe3dffb3c6b3b1c586d0e7d3d54
- Child Cost Item: 37b3825374580ffdba393c596c7d2289
- Child Cost Item: c9dd2005abde5a042cd052a5953b9fd6
- Child Cost Item: 2e01a501f3f7b6d9588b635cc0d2e355
- Child Project: ALaMO
- Child Accomplishment: Systems Engineering and Testing
- Child Cost Item: 3b68fde7a72ff2c6b1bd09d8867ac32b
- Child Cost Item: 2dd4359308d25a6946a877314c331038
- Child Cost Item: cf47808732c3d68a25485ae04c082f23
- Child Project: Griffin Missile
- Child Accomplishment: Griffin Missile System (GMS) Rapid Deployment Capability (RDC)
- Child Cost Item: 2e266e4c67f54ef036aad8533d322684
- Child Cost Item: 0004da13e2cca31090cb747ca7ec5913
- Child Cost Item: 1edcd1d71ba891b7a5d3a25b6cd27286
- Child Cost Item: 289173f1cb640faee81d96e51d58e5cc
- Child Cost Item: 45fee0c46f9e9350ebc4bd6a56d0984a
- Child Cost Item: c455545b2f1c721c786009fb83ed62c9
- Child Cost Item: de024df39a19e82aef4184263db780ad
- Child Cost Item: 1f32b22abfdcc99a1d2ca668afcd2bd6
- Child Cost Item: ece14343a4aa94925ac1f537b22fee1c
- Child Cost Item: e5a3bf6ab47cfa6573986f2bb088c6d6
- Child Cost Item: 9c721d927d21d62409901ec96a5c9d6e
- Child Cost Item: 0879c9442e40775e745fb9f4ad8c5a7d
- Child Cost Item: eda27b451d81a0d4e9b974badd28bea0
- Child Cost Item: d544f79c8297a44f8353e2005e58998f
- Child Project: Phalanx CIWS SEARAM
- Child Accomplishment: Tech Refresh & Next Gen CIWS / SeaRAM on DDG Class
- Child Cost Item: 88f7f1ea8b98b6119893cdb8c43bbe33
- Child Cost Item: d7737a14fbe4d671d8dad5ba8563e989
- Child Cost Item: a8e86197e5b67a91b5c4fdf9ca768cc3
- Child Project: Congressional Adds
- Child Cost Item: ee295b4a91583174da770774105a57ed