(U)Joint Strike Fighter (JSF) - EMD
Abstract
The F-35 Joint Strike Fighter (JSF) Program will develop and field an affordable, highly common family of next generation strike aircraft for the USN, USAF, USMC and allies. The three variants are the F-35A conventional takeoff and landing; F-35B short takeoff and vertical landing; and the F-35C Aircraft Carrier suitable variant. The F-35A will be a stealthy multi-role aircraft, primary air-to-ground for the Air Force to replace the F-16 and A-10 and complement the F-22. The F-35B variant will be a multi-role strike fighter aircraft to replace the AV-8B and F/A-18 for the Marine Corps, replace the Sea Harrier and GR 7 for the United Kingdom, and replace the AV-8 currently employed by the Italian Navy. The F-35C will provide the Department of the Navy a multi-role, stealthy strike fighter aircraft to complement the F/A-18E/F. The United Kingdom, Italy, Netherlands, Turkey, Canada, Australia, Denmark, Norway, and Foreign Military Sales customers are also participants in the JSF program. The program shown here reflects USN, USMC, USAF, and International Partner funding. Funding at the accomplishment/planned program level is reported as the total of all services and partners as these activities support all aircraft variants. The System Development and Demonstration (SDD) budget funds a total quantity of 20 RDT&E test articles to include 6 ground test articles and 14 flight test articles for USN, USMC, and USAF use. FY07: 1 F-35A flight test article FY08: 1 F-35B flight test article; 1 F-35B ground test article FY09: 1 F-35B flight test article; 2 F-35A ground test articles FY10: 6 flight test articles: 3 F-35A, 2 F-35B, 1 F-35C; 3 ground test articles: 1 F-35B, 2 F-35C FY11: 4 flight test articles: 1 F-35A, 1 F-35B, 2 F-35C FY13: 1 F-35C flight test article JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SDD because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2018
- Source ID
- 0604800M_5_1319_PB_2018
- Change Summary Explanation
- FY2018 Increase: $53.09M to extend F-35 System Development and Demonstration. Sustainment/Capability Enhancements Standard Operating Unit schedule slipped from 01/2017 to 04/2018. Initial Operational Test and Evaluation (IOT&E) schedule slipped from 04/2018 to 01/2020.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Joint Strike Fighter EMD STOVL
- Child Accomplishment: System Development and Demonstration (SDD)
- Child Accomplishment: F135 Propulsion System
- Child Accomplishment: Systems Engineering (SE)
- Child Accomplishment: Development Test and Evaluation (DT&E)
- Child Accomplishment: Development Support
- Child Accomplishment: Autonomic Logistics Information System (ALIS)
- Child Cost Item: a0943a3fd936c58f757688032e05a5bd
- Child Cost Item: aab0833fa4558fc9bb53d21a44061f97
- Child Cost Item: 22435245c7360913b788e8db172c09a0
- Child Cost Item: 191f85867a7830dba91ec9277ceafb60
- Child Cost Item: bb4dc47e5d17eed0f2857e6f085e2530
- Child Cost Item: 60f30aba69569f3aa286a2fd20c47da3
- Child Cost Item: 3f2f771bc8ac63f0d0c6ba344e85e8ea
- Child Cost Item: 8ae9ab7c5ae29f351f5bfc24f37a0fdf
- Child Cost Item: 45552e6874d7ae0c3cd56ab8da134bf0
- Child Cost Item: 34cf1bab12f2a6f804f1785be84f14a7
- Child Cost Item: 4010b17599203758939895d16de4664a
- Child Cost Item: df57e05af75aafcfc7feb037973eca87
- Child Cost Item: d2d45526559cb12dd1379dcc4572e3fe
- Child Cost Item: d5ce9bc71b7282f1f64333da127891b6
- Child Cost Item: e615036b838a359b34fe6adc13a67d92
- Child Cost Item: afc6afa1464357a25fefee62db662632
- Child Cost Item: 3efad9409598b218a77067b368c8f0af
- Child Cost Item: 64fcc32d3767af454aed121fa0f5a9cb
- Child Cost Item: 41179344d762d9ed582ef1f39e38c8e8
- Child Cost Item: 6b4d93233633a051489d0495201199b9
- Child Cost Item: f69fe34cd520bd0d8a62a77e22da69a1
- Child Cost Item: 0a7ae3596b887df81ee21ad749a91e97
- Child Cost Item: 01355087c7150a59b87c9883f49dae95
- Child Cost Item: 5cafd588ca5550f02de3b7363e351870
- Child Cost Item: 0ea1a47838a4452ff59990f99546d79e
- Child Cost Item: ea77c83e2a7f263b28a84db75346764a
- Child Cost Item: 29f9c9b49f201eae2003909d0aabca08
- Child Cost Item: 6e2dc6cb751f9660997da3cbf21be1db
- Child Cost Item: 4c9bd325db3b163bf0ea70e052b4fce6
- Child Cost Item: e238698b2ca238aa8f3d6dbde89d9b7a
- Child Cost Item: fba555affa12e087c53b14855dbe3207
- Child Cost Item: 2080e685ff76d8006e25d83ee745f6c3
- Child Cost Item: bc368250e18acf09aaf80e63fcdca0c0
- Child Cost Item: 21e86f58e2d0fb7006f3cd672d64a900
- Child Cost Item: aabe93975bd3cac45baa77b683312026
- Child Cost Item: e67b987ec6e6e349dfedc0f0ca41e7d2
- Child Project: F-35B Sustainment/Capability Enhancements
- Child Accomplishment: Sustainment and Capability Enhancements
- Child Accomplishment: Development Support
- Child Accomplishment: Development Test and Evaluation
- Child Accomplishment: Autonomic Logistics Information System
- Child Cost Item: 9405ae99cfc97aa478bb483c8b2da96b
- Child Cost Item: 3f9ba0a96f64c9c6b1b1f9a4c0e897b9
- Child Cost Item: c0da47144ee67a034b96def216e81e89
- Child Cost Item: f56834527a17200a2344aaba727fea3b
- Child Cost Item: f18f957e49fc3da88f1f14a4cb050d2c
- Child Cost Item: 23d16cc86adcfc8b6d27fd8963052a29
- Child Cost Item: c71dc6554674abee94bb3f0ddccd355d