Logistics and Engineer Equipment - Eng Dev
Abstract
This Program Element (PE) provides system development and demonstration for various projects. This PE includes the development of water craft, military tactical bridging, material handling equipment, construction equipment, engineer support equipment, soldier support equipment (to include shelter systems, environmental control, field service equipment, camouflage systems and aerial delivery equipment), water purification equipment, petroleum distribution equipment, and mobile electric power.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2022
- Source ID
- 0604804A_5_2040_PB_2022
- Change Summary Explanation
- The increase is due to: Project 194 - Increase is due to the testing and evaluation of STEP Lightweight, development of STEP 3kW and PDISE Expansion FY22 prototype build contract award. Project VR7 - RDT&E funding reinstated in FY22 to resume ASF-RWS program development. Project EJ9 - Increase is the result of more substantial efforts consisting of Ship to Shore / Over the Shore Logistics Vessel (SSLV) market research along with affordability and feasibility studies to inform the SSLV Analysis of Alternatives (AoA) and requirements development process. Project L41 - Increase is for development and testing requirements for multiple Petroleum and Water System's programs.
- Service Agency Name
- Army
Entities
Organizations
- United States Army
Related Documents
- Child Project: Engine Driven Gen Ed
- Child Accomplishment: Power Distribution Illumination Systems Electrical (PDISE) expansion
- Child Accomplishment: STEP
- Child Accomplishment: Small Power Sources
- Child Cost Item: 9225b754b25f28d2d77d6d7e2ee89495
- Child Cost Item: 73dd69bf686e0c7fcc7df3afd1e06413
- Child Cost Item: 6dfda3fca88e73db2de7ffac42092c34
- Child Cost Item: fd25988be66fffed103ad8d49927096c
- Child Cost Item: 944733ab2779758162275bbb8c7b316a
- Child Cost Item: 3549c8a9f3421481411d173303db9599
- Child Cost Item: 3b65782a08d3911e8faafda9436692d1
- Child Cost Item: 37a58b6864ffae99cd70058795a57d92
- Child Cost Item: 794bca7aea2c7523e0ab94936e905827
- Child Cost Item: d0bc10a5e29f0e260de9a5daa7ef5786
- Child Cost Item: a5873c094d5cd30bc0490d10194cfe86
- Child Cost Item: e35af876faba54b519d506c90e2e5586
- Child Cost Item: de145cd59e4dfc125aadc888f7b26e0b
- Child Project: Maneuver Support Vessel (MSV)
- Child Accomplishment: Engineering and Manufacturing Development (EMD) Contract
- Child Accomplishment: Government Test and Evaluation Support
- Child Accomplishment: Government Furnished Equipment (GFE)
- Child Accomplishment: Program Management / Systems Engineering
- Child Accomplishment: Program Management Support Contract
- Child Accomplishment: MSV(N) Affordability and Feasibility Studies
- Child Cost Item: b18734a49fc95b445ca29af166b57d8a
- Child Cost Item: 81d27faf41a22eaece1ee7983bd40a87
- Child Cost Item: 9e36f1f4ddc3d9d06b1cb7c57dcf3fee
- Child Cost Item: 5a9613bec1efdb08f4e38cbddccd7db7
- Child Cost Item: 7510ba3be424ccad644d92df7ae76d55
- Child Cost Item: f302769ab4e301a700c1758792417b4e
- Child Project: Ultra-Lightweight Camouflage Net System (ULCANS)
- Child Accomplishment: Ultra-lightweight Camouflage Net System (ULCANS)
- Child Cost Item: 6c9b56242c9533012142c8f54ae96e93
- Child Cost Item: d02217249a7f58489cdf94191000220f
- Child Cost Item: 29604b304abacf89a7d60955be3fb414
- Child Cost Item: 7f64f32dd3de66c14ca7a897f63f6d74
- Child Cost Item: 226813f818bdddb38d5f03ede12ff427
- Child Cost Item: 0c1313bf5c753d9c7250a466351df462
- Child Cost Item: 16241b88400a84a0aa817ac1e993ed9a
- Child Cost Item: 2d4475dd6e969f99a27f20aa9970ff0e
- Child Cost Item: 2c93e34055a6b20465bb4ed22064a506
- Child Cost Item: 823380dacc07a96e482bde0091cf6d5d
- Child Project: Tactical Bridging - Engineering Development
- Child Accomplishment: Line of Communication Bridge (LOCB)
- Child Accomplishment: Bridge Supplemental Set (BSS)
- Child Accomplishment: Family of Higher Military Load Classification Bridges (FoHMLC-B)
- Child Accomplishment: M1A2 Chassis Upgrade of Joint Assault Bridge (JAB) and Assault Breacher Vehicle (ABV)
- Child Accomplishment: Joint Assault Bridge (JAB)
- Child Accomplishment: Pending Reprogramming
- Child Cost Item: cb8a1f697aa0bb9dfabf500c17cb15da
- Child Cost Item: 0529f50fdc46c4258d3b113c71b60a90
- Child Cost Item: d05a601feb9f1009ccbc4ea10a212800
- Child Cost Item: 025b0eb04f99fdc345a911141d9147cd
- Child Cost Item: 617f9179c1314f6f06ab7bf269bf7fe5
- Child Cost Item: 8acf144411994bced5a2457b501c5601
- Child Cost Item: 81e6f91ffa16c8f5fd58b9c6188bb04d
- Child Cost Item: 5c105621687ae0ef8eeecee0319e19b6
- Child Cost Item: aa5c8b31c4573efa200cbcd7ffde9c79
- Child Cost Item: 59f1dcce3c9a846122858178fc46c02a
- Child Cost Item: f2c835e94b6f7019881555f6ddc400de
- Child Cost Item: 78eb0adcece65df0daeecc31e0a5e957
- Child Cost Item: 18ee6453d05d072af4883952e7221850
- Child Cost Item: e435926c6a93638af3bdf1e089823b67
- Child Cost Item: 8e6a6e220c3404485398364284c8e2b1
- Child Cost Item: e96002803cbbba0b210958f8ec0f74d0
- Child Cost Item: 9675f6e321c28b7fb3ddf3a90a5270bc
- Child Cost Item: 53a2f175148c4a84e6f37210071dda59
- Child Cost Item: 23b5cfe5038079a88af3f708b1da7001
- Child Cost Item: 57ea4e14218788bab6cfc55c9304f521
- Child Cost Item: 7a086946dbe4df48b9743bcd5fc16f8b
- Child Cost Item: cf7af34b323c6d361ef742fe5c759465
- Child Cost Item: 81b0625f844b5d82ca66827d2a8cb1b7
- Child Cost Item: 38b68367d72d0d95181cb89c86c35d51
- Child Cost Item: 4db41e5a01410e50823668cb3afa981e
- Child Project: Field Sustainment Support Ed
- Child Accomplishment: Rapid Rigging and DeRigging Airdrop System (RRDAS)
- Child Cost Item: 4c49df06e8773f9b32d965237d952407
- Child Cost Item: fccadf9a90a1ea1c4c89d452a68ebbce
- Child Cost Item: b988cfe2dfd9062939da5f15fc4132bc
- Child Cost Item: 0cdfd15f7379cde1640d48bfcf8009af
- Child Cost Item: 8c61ff25cf4f0cf874a996a902ecbf33
- Child Cost Item: ff532dbcc0a53cc659ea3ef273d826a9
- Child Cost Item: ee555675bb640a19a6ed730b54b9733d
- Child Cost Item: 0d1785b0033f301858920fbc55b42f4f
- Child Cost Item: 4a7d81886713ba22a0b085d277d2d07d
- Child Cost Item: 241f0f96355ce1e744ac53908394e33a
- Child Cost Item: 92028aaad28f26a0d227619fadc00161
- Child Cost Item: a9b342b76ce868b91813ba390f323643
- Child Project: Water And Petroleum Distribution - Ed
- Child Accomplishment: Water Bison / Bison Lite
- Child Accomplishment: Early Entry Fluid Distribution System (E2FDS)
- Child Accomplishment: Modular Tactical Retail Refueling System (MTRRS)
- Child Accomplishment: Petroleum Expeditionary Analysis Kit (PEAK)
- Child Accomplishment: Tactical Fuel Distribution System (TFDS)
- Child Accomplishment: Load Handling System (LHS) - Compatible Water Tankrack System (HIPPO)
- Child Accomplishment: Bulk Fuel Distribution System (BFDS)
- Child Accomplishment: Water and Storage System (WSDS)
- Child Accomplishment: Modular Fuel System (MFS) Tank Rack Module (TRM) - M107 40gpm Pump Modification Kit
- Child Cost Item: b96518aca83a084da487cc1f49aef81d
- Child Cost Item: 71c5a3c026ef66078793e328fc20d393
- Child Cost Item: 53cac51200c0671fd61a3c48597c2604
- Child Cost Item: f54e195d5487c9914345057ff786c54d
- Child Cost Item: b907a850f0df29a7aeb0fc5a8ea065b6
- Child Cost Item: f05c5bd4c7d178e781eb2c2252fdabe2
- Child Cost Item: d2e2c1e3743a5c5a6bedbf90b83cd543
- Child Cost Item: 363d57f9cd5067765d1e7f1e625c6f5b
- Child Cost Item: 301a984e48275aa69ff335015cf797f6
- Child Cost Item: e3a8bb0d92c24375205ad814032f4c42
- Child Cost Item: 9e27cd96439a5ff58694c5d6a68ccf93
- Child Cost Item: 072878d7dfb25b43ae43967b98eb7f52
- Child Cost Item: 57fbac1721dbcc515aa8dd8e19321c7d
- Child Cost Item: bb947e6a8b0a3eca940841e22cb73a8a
- Child Cost Item: 2d2c0da324b81248b8ba84622922dafb
- Child Cost Item: 67f0eb752879bf1358cc67cdcf2d5c59
- Child Cost Item: 3e62434043e286f0aba2ef0081862cf2
- Child Cost Item: 231f7dcd7d5ea5be7fb9de937bb3a5c2
- Child Cost Item: f4c8a262be4efee8db9d9f754a095995
- Child Cost Item: 173a6ebd99003e623ae8de774fcd1093
- Child Cost Item: 8244e73c90fffc29b531d759853ea3b9
- Child Cost Item: 03b96122e54dc9a90af855f9e927e0fc
- Child Cost Item: ac23fe2035be5d4a850da2fdbac19cb7
- Child Cost Item: 23e4835ed8c52fbe7f89f5779f49ff05
- Child Cost Item: a652e5880780d4d441d65e4013ae3f91
- Child Cost Item: ca32b50c7af1f7793713629b87982af2
- Child Cost Item: 4b3aa92358d8a86cebc8c03aefb345ea
- Child Cost Item: 3bac9022148b7864abdcc1cc6468930c
- Child Project: ENGINEER SUPPORT EQUIPMENT - ED
- Child Accomplishment: Family of Power Utility Kits (FoPUK)
- Child Accomplishment: Supervisory Propulsion, Emergency and Recovery Set (SPEaRS)
- Child Accomplishment: Program Managment Support
- Child Accomplishment: Family of Boats and Motors
- Child Cost Item: 2ca1441ca1343fb1dddcbfeb6f234cea
- Child Cost Item: d8d725193dad389fa1cc4c444d3e7d37
- Child Cost Item: deb936a91226f50b9683bf810461ca65
- Child Cost Item: dad4c1d2f3f033b78aead272acb6dfde
- Child Cost Item: 8b91d592d099fcc3c0b4bd8cdb2c6639
- Child Cost Item: 6abc8fa693d52653070d5bd20c5e6e63
- Child Project: Maintenance Support Equipment
- Child Accomplishment: MWMSS Additive Manufacturing
- Child Accomplishment: Next Generation High Mobility Multipurpose Wheeled Vehicle (HMMWV) Shop Equipment Contact Maintenance (SECM) ATR
- Child Cost Item: 396dcb0703ba67c644de32ebdf88bb12
- Child Cost Item: 5ec005cb4a9b4e5cd0bfdcb7b4673198
- Child Cost Item: cfceba71867c7d80036d5643eae2c232
- Child Cost Item: 93e55d179de73a9abf6ef9de04247a69
- Child Cost Item: 18866e13670421109afb118dcd424f07
- Child Cost Item: e20b9a9ab8e09f38777322a8dbbbd8d2
- Child Cost Item: 4f8b1cc414803e61e1744a1f4b81ec26
- Child Cost Item: caad4bb0cee69f664182982823fd8324
- Child Cost Item: 0ce3b09d0162ab2d22dd28efc927c693
- Child Cost Item: fb3b319900f46734b128fe84ddc5670f
- Child Cost Item: 85745c5b8ef2a49fd7db0d965a30c36d
- Child Cost Item: 5c0ad458782e1b012abe7a3990158ed4
- Child Cost Item: 684fbaeaa832a354ca5da20201c4a4c5
- Child Cost Item: b73fc916b3b93e57114df530b9abdb6e
- Child Cost Item: 32cb6367c71fcf920348d80ade0b07f4
- Child Cost Item: f2e6aa6d1886024591a9f07f77af0123
- Child Cost Item: 08caf53617bcd79b935b5a1a6b14057b
- Child Cost Item: 4bcdf8e46c529b9da31431679b3c4a53
- Child Cost Item: 5cec0abafcd4ed7874e23a8dc2422637
- Child Cost Item: 67f3e3fbe7ac3f150d2eaec99089a549
- Child Cost Item: 509b35cd66b1fbcbf74f3ac69c2d85f7
- Child Cost Item: 35e0f9f1565bf5ad0c6a6264178acd60
- Child Project: Improved Environmental Control Units Ed
- Child Accomplishment: Technology Development
- Child Accomplishment: Government System Test and Evaluation
- Child Accomplishment: Other Contract and Government Agency
- Child Accomplishment: Government Program Management
- Child Cost Item: e6c3eec69f0153444f7c924d10667f93
- Child Cost Item: 87fefae9eb0a4feac4d625d2418a1e65
- Child Cost Item: f3a171ad647123e6453aa04f89ac54c9
- Child Cost Item: 34314a37625f09a06709a265f3be29d7
- Child Cost Item: 74589e06b49d07548a21033fd21c16b3
- Child Cost Item: 89b0d577b7b5e944566c885a3d564c56
- Child Cost Item: a7876a0489b407a55685e946ae4a5979
- Child Cost Item: 2d77e3416896ef9588530cc3634662c6
- Child Project: Combat Service Support Systems
- Child Accomplishment: Army Standard Family of Rigid Wall Shelters (ASF-RWS)
- Child Cost Item: 0a804a9624086604dcf9e3bee4f40657
- Child Cost Item: 33d83caec497ef27a46b10838f8e2793
- Child Cost Item: 5e0339ce5a8bf99a7e1d37b79f4bcb58