Soldier Systems - Warrior Dem/Val
Abstract
This program element contains five projects: Project S65 - Soldier Power: Soldier Power enables dismounted Soldiers to efficiently execute missions for longer durations by reducing the logistical burden associated with fuel and primary (disposable) batteries. Platoon Power Generation (PPG) - PM E2S2: This project supports the demonstration and development of a PPG. The Small Unit Power (SUP) PPG (1kW Generator) will provide small units with sufficient portable power to sustain Modified Table of Organizational Equipment (MTOE) unit power demand in support of 48 to 72 hour missions using a common logistical fuel (JP-8). It will be used for charging batteries and powering various types of Army communications and electronics devices. Project EY2 - Integrated Soldier Power Data System - Core: Integrated Soldier Power and Data System-Core, Conformal Wearable Battery, Squad Power Manager (SPI) fills the power and energy gaps created by the increase in mission essential, Soldier portable power consumers, such as situational awareness displays, GPS systems, weapon sensors, radios, and other devices. Project EY3 - Soldier Power Generator (SPG) - fills the power and energy gap created by the increase in mission essential and power consuming devices, by providing a single charging solution capable of providing power to handheld communication devices and a suite of military batteries. SPG is intended for use in the most austere operating environments providing the Soldier with energy independency for extended mission duration. The system will provide the Soldier with a lightweight, worn or carried power generation capability, integrated within the warfighters combat load. Project EY4 - Universal Battery Charger: Universal Battery Charger (UBC) fills the power and energy gap created by the increase in mission essential, Soldier portable power consumers, by providing a sole charging solution capable of providing power to handheld communication devices and a suite of military batteries. Project DX7 - Tactical Communications and Protective System (TCAPS): TCAPS enables Soldiers to communicate over radios in combat environments while simultaneously providing hearing protection from both steady state and impulse noise.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2019
- Source ID
- 0604827A_5_2040_PB_2019
- Change Summary Explanation
- Service Agency Name
- Army
Entities
Organizations
- United States Army
Related Documents
- Child Project: TACTICAL COMMUNICATIONS AND PROTECTIVE SYSTEM
- Child Accomplishment: TCAPS testing and evaluation.
- Child Accomplishment: System Engineering and Program Management (SEPM)
- Child Cost Item: 3c195f36c9e4768993e9784764e876bd
- Child Cost Item: 07caaee64714e1961d3a553c6465462c
- Child Cost Item: 3b5d0e2f5e51e86bfaff551be6e95248
- Child Cost Item: a258b27be3a0904585ad5b0e904eeecc
- Child Cost Item: 341bf27e55ae408aa440829ded8c890a
- Child Cost Item: 9e18a79474988488b50b0a5304c3efab
- Child Cost Item: a56d623a5d143a561f06abfee76c5874
- Child Project: Integrated Soldier Power Data System - Core
- Child Accomplishment: Test and Evaluation
- Child Accomplishment: System Engineering & Program Management
- Child Accomplishment: ISPDS-C/CWB Capability Improvements Integration
- Child Cost Item: d942ea8538f1d0abf26babd0711c11e5
- Child Cost Item: e94729efff8a4a4e4827976f14d33b02
- Child Cost Item: 4168931c6d26a2d83323637a98d7cdc9
- Child Project: Soldier Power Generator
- Child Accomplishment: Test and Evaluation
- Child Cost Item: c5b334ab5fc3a20d074e92d6e515e112
- Child Cost Item: 2ed193fb1838c499109234c7c9110810
- Child Project: Universal Battery Charger
- Child Accomplishment: Test & Evaluation
- Child Accomplishment: System Engineering & Program Management
- Child Cost Item: 46e68188c5bbeaca48f38b8dc2947339
- Child Cost Item: ddfd29b59f73c0738e1008d1dae00c57
- Child Project: Soldier Power
- Child Accomplishment: Soldier Power Generation (SPG)
- Child Accomplishment: Soldier Power Test and Evaluation
- Child Accomplishment: Platoon Power Generation (PPG) - PM E2S2
- Child Cost Item: 1f4b68b5421eeb01c906acf29d20d7e9
- Child Cost Item: 213daae1590ba658a0253d765a0f177e
- Child Cost Item: 1cfa02281d3c128d5cff074d3cbae61f
- Child Cost Item: 58dbc27ff1d79e44033a1ce0655aabe4
- Child Cost Item: 2e9f0cf2b2bab7764e69383e067d2de7
- Child Cost Item: b6a4a1c7d59481d54d45b8ca6fe97f39
- Child Cost Item: 47482f3b8c64978fd203a38ec029172a
- Child Cost Item: c0bd5e7950da87be8d005f4d8f247d13