(U)Mission Planning
Abstract
Mission Planning PE is used to develop automated mission planning systems to support Naval Aviation. Joint Mission Planning System (JMPS) is the designated automated mission planning system for the Navy, supporting over 40 T/M/S and expeditionary forces. JMPS-M enables weapon system employment by providing the information, automated tools, and decision aids needed to rapidly plan aircraft, weapon, or sensor missions, load mission data into aircraft and weapons, and conduct mission rehearsal and post-mission analysis. JMPS-E is a scalable, tailorable, mission planning and execution monitoring tool for Amphibious Squadron staffs. Stores Planning and Weaponeering Module, also referred to as Weaponeering and Stores Planning (WASP), is an integrated software product that allows aircrew to determine the best combinations of weapons and delivery conditions to achieve the desired level of target damage, eliminate weapon delivery solutions that violate aircraft Type/Model/Series (T/M/S) specific safety-of-flight envelopes, and perform detailed weapons employment planning for F/A-18 and E/A-18G aircraft. Common Helicopters is used to develop unique planning capabilities for helicopters for integration into Joint Mission Planning System (JMPS). JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under MISSION PLANNING because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2018
- Source ID
- 0605215N_5_1319_PB_2018
- Change Summary Explanation
- Technical: N/A Schedule: 2213: Prior to FY17, schedule for the Joint Mission Planning Systems (JMPS) profile is under PE 0604231N. The Increment 4/64-bit development effort was originally scheduled to be completed in Q4 of 2017. However, the program has since modified the contract, extending the period of performance to February 2018 to better leverage collaborative development efforts with the Air Force. No savings are associated with this extension because MPE integration efforts are concurrent with development efforts in FY17 & FY18. 2311: Prior to FY17, schedule for Stores Planning and Weaponeering Module profile is under PE 0604215N. 2312: Prior to FY17, schedule for the Common Helicopter profile is under PE 0604215N. Common Helo Test and Evaluation period added starting in 1QTR FY18 to identify the integration and test activities for Common Helo Components into the JMPS FW.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Mission Planning
- Child Accomplishment: Mission Planning Environment Program Mgmt, Integration, and Test
- Child Accomplishment: Joint Mission Planning System Expeditionary (JMPS-E)
- Child Accomplishment: JMPS Framework (FW) and Common Components (CC) Development
- Child Cost Item: 845aae7734213c1f9e8bfd96701be101
- Child Cost Item: 8a83fdf1571136f2fb8ee96dcfc81517
- Child Cost Item: 79964271558b21c736ac82f5dafab843
- Child Cost Item: 7ff3c4984b37f8679dd197e9b5a4b4e2
- Child Cost Item: b25e89a269be43bfcb35c45f64f1032b
- Child Cost Item: 839a6b6292d13f70359408b3ad635ee0
- Child Cost Item: 0cae25f3acba8fbdb00e29ad373bf57b
- Child Cost Item: aedcf92c5d7b75247713c4c9f3b6b024
- Child Cost Item: e09ff715144d71cc14f96dc8cfada062
- Child Cost Item: 31b212f99234821997e7b0b175716263
- Child Cost Item: 826832aa322b4f9d25e0fd682305a599
- Child Cost Item: cad3a4ece928252d561d8b11e3d964a7
- Child Project: Stores Planning and Weaponeering Module
- Child Accomplishment: Product Development
- Child Accomplishment: Test and Evaluation (T&E)
- Child Accomplishment: Program Management/Systems Engineering
- Child Cost Item: 4c3ec19d4aabf876a79fd8c04ffc53ee
- Child Cost Item: a0dbdaeb047920e337ff46fe7617d442
- Child Cost Item: 62c9099eab162cf9470917fbce6a7605
- Child Cost Item: 8f11be6ed0f0adc7c4de376b134a4363
- Child Cost Item: e85f616bcb32f38cf4d6be6be503faf1
- Child Cost Item: edf797cdf383d98f44899b8710bee844
- Child Cost Item: 9f51117a84f340b94c144e6277d30d4e
- Child Cost Item: 8adb0b5f05ce6da1cc275d52ca5d1b6d
- Child Cost Item: f5ba2003b4d11b8462e6db1e56eb2cb4
- Child Cost Item: 840c16387229f83cb6f185069124f9a8
- Child Cost Item: 45f457f1388a95d7ce3a49bf76cf8298
- Child Cost Item: c88cd7ad0f2a870d1b80d995b8fe76f0
- Child Project: Common Helicopters
- Child Accomplishment: Product Development
- Child Accomplishment: Test and Evaluation