(U)Mission Planning
Abstract
The Mission Planning PE is used to develop automated mission planning systems to support Naval Aviation. The Joint Mission Planning System (JMPS) (Proj 2213) is the designated automated mission planning system for the Navy, supporting over 40 Type/Model/Series (T/M/S) of U.S. Navy and Marine Corps aircraft and expeditionary forces. JMPS-M (Maritime) enables weapon system employment by providing the information, automated tools, and decision aids needed to rapidly plan aircraft, weapon, or sensor missions, load mission data into aircraft and weapons, conduct mission rehearsal, execute missions, and conduct post-mission analysis. JMPS-E (Expeditionary) is a scalable, tailorable, and collaborative web-based mission planning and execution monitoring tool for Amphibious Squadron (PHIBRON) staffs embarked with each Amphibious Ready Group (ARG) and Expeditionary Strike Group (ESG). Electronic Kneeboard (EKB) is a mobile device configured with various software applications and features to support aircrew during pre-flight planning, in-flight re-planning and mission execution, and post-mission debriefing and analysis. Common Munitions BIT/Reprogramming Equipment (CMBRE) (Proj 2213) provides USN/USMC forces the critical capability to perform built-in test and programming/reprogramming of various weapons. FY 2020 and out includes funding for the research and the development in order to develop upgrades to the CMBRE system to support advanced operational capabilities, address system obsolescence, meet cyber security requirements, and meet mission readiness requirements. The Next Generation Naval Mission Planning System (NGNMPS) (Proj 2213) will address critical capability gaps and deficiencies in the legacy JMPS that are required for modern 21st century integrated mission-centric and collaborative multi-domain mission planning, execution and analysis. NGNMPS will replace Naval Aviation's legacy JMPS no later than 2027 while also affordably leveraging prior investments across the legacy systems to deliver integrated and collaborative capabilities. NGNMPS will affordably address technological obsolescence while also delivering collaborative and automated capabilities in an integrated virtual collaborative data environment. NGNMPS will also incorporate service-oriented architecture to provide revolutionary improvements in workflow, usability, cybersecurity, information and decision aids needed to rapidly plan/employ/maximize effectiveness of aircraft/weapon/sensor/payload mission plans; perform advanced pre-mission rehearsal/analysis; provide functionality to load mission data into aircraft and weapons; enable dynamic replanning/retargeting against evolving threats in contested environments; perform integrated and advanced post-mission debrief/analysis; support cross-domain capabilities; and support portability of mission planning, mission, execution, and mission analysis functions. The Stores Planning and Weaponeering Module, also referred to as Weaponeering and Stores Planning (WASP)(Proj 2311), is an integrated software product that allows aircrew to determine the best combinations of weapons and delivery conditions to achieve the desired level of target damage, eliminate weapon delivery solutions that violate aircraft T/M/S specific safety-of-flight envelopes, and perform detailed weapons employment planning for F/A-18 and E/A-18G aircraft. FY20 and out include funding for the research and development in order to integrate WASP with 3-D mission rehearsal, provide dynamic Safe Escape Automation Layer (SEAL) calculations on Electronic Kneeboard (EKB) SEAL, develop WASP for other Navy and Marine Corps platforms, and support WASP development and integration with Next Generation Mission Planning Systems (NGNMPS). Common Helicopters (Proj 2213) is used to develop unique planning capabilities and tools for helicopters (e.g. Weight and Power Calculators (WPC), Common Mission Data Loader (CMDL), Weapon Employment Zone Overlays Tool (WEZOT) and Point Selection Tool (PST)) for integration into JMPS Mission Planning Environments (MPE). Starting in FY19, Common Helicopters RDT&E funding in PU 2312 was consolidated with JMPS-M Mission Planning funding in PU 2213. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under MISSION PLANNING because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2020
- Source ID
- 0605215N_5_1319_PB_2020
- Change Summary Explanation
- The FY 2020 funding request was increased by $33.7M in Proj 2213, to include funding for Next Generation Naval Mission Planning System (NGNMPS) Development (+$26.4M) and Next Generation Common Munitions BIT Reprogramming Equipment (CMBRE) (+$16.6M). TECHNICAL: Proj 2213: Updated mission description, budget item justification and acquisition strategy to incorporate additional NGNMPS language. Added additional sections to the R-2A to break out funding for NGNMPS. NGNMPS requirement analysis and Framework development were funded in FY 2018 and FY 2019 under the "Mission Planning Environment Program Mgmt, Integration, and Test" and "JMPS Framework (FW) and Common Components (CC) Development" respectively. Added additional sections to the R-2A to break out funding for FY 2020, Next Generation CMBRE. SCHEDULE: Proj 2213: Added Next Generation CMBRE development milestones, and Next Generation Naval Mission Planning System acquisition and software development milestones. Proj 2311: Changed WASP V4.1 completion of Systems Development and Test & Evaluation from 1Q 2020 to 2Q 2020. Added WASP V5.3 Systems Development, Test & Evaluation, and Production Milestones. Proj 2312: Common Helicopter efforts are consolidated under PU 2213 Mission Planning FY 2019 and out.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Mission Planning
- Child Accomplishment: Mission Planning Environment Program Mgmt, Integration, and Test
- Child Accomplishment: Joint Mission Planning System Expeditionary (JMPS-E)
- Child Accomplishment: Mission Planning Framework (FW) and Common Components (CC) Development
- Child Accomplishment: Next Generation Naval Mission Planning System (NGNMPS) Development
- Child Accomplishment: Next Generation Common Munitions BIT Reprogramming Equipment (CMBRE)
- Child Cost Item: 0ea1783604a3b52324c5e891fba24b41
- Child Cost Item: 3a4e9bcda760ca6c2c53a28ed5d1fe40
- Child Cost Item: 93dabf84783fd050282b7a1edc8dee0b
- Child Cost Item: bf52a7ecfc8326cc7aa61d40aa7ecc8a
- Child Cost Item: 2a37ca67c9f2002a16b2e0299d3904b6
- Child Cost Item: 729845f41fe6fec17b6b007a139a538f
- Child Cost Item: a1eaa61cc9f0d39531db46b9777cf6c9
- Child Cost Item: 0fd26325157f8d302a7633c6b223f1cf
- Child Cost Item: 6112b7c2850dc0cb7644ef519d21e49a
- Child Cost Item: 093648db8683ae04728662e6379d2655
- Child Cost Item: f6a038169eb5d538b6d72677eb5a6654
- Child Cost Item: 99941dc70a36af8bd396f58b1045e393
- Child Cost Item: dab36fcf4447f2a7e092e8f4997f2964
- Child Cost Item: 7bd9225cab642593161f0398aaeade87
- Child Cost Item: c2c26e368d1232a2511b75c956ad9af2
- Child Cost Item: 0fe82f0bd0b3aa7f9505f33d295c5eb5
- Child Cost Item: fee31b57b8e7052fd6cc13d588859402
- Child Cost Item: 6ee7d4669c9ec78a365dd1172ef9d0b3
- Child Cost Item: 9ff653738a49e1f6187ce9c38d089557
- Child Cost Item: 04d0a668b57b668c1336d474a7e9ca5f
- Child Cost Item: b8002c4233a28626ac119b73a7b4a534
- Child Cost Item: 170ce12758d03263ae2d8743181d3996
- Child Cost Item: fb37ed6ee49c36ac246d4a200fab0b0a
- Child Cost Item: 0b05182acb64087c0f1fa1f13619c875
- Child Cost Item: 68380663bbca61bb388f88b759348c6e
- Child Cost Item: 26379924bbd5b6b4263c6bf5814330b8
- Child Cost Item: ac3228be6c00040fc8872a24e9bde31c
- Child Cost Item: 1a5f1f85593a22dbfb78ade4c0fd27f8
- Child Cost Item: c2077cbd2eeb8248834269da5fc7ea9a
- Child Cost Item: b1074336e212c8fabb1563853803a6de
- Child Project: Stores Planning and Weaponeering Module
- Child Accomplishment: Product Development
- Child Accomplishment: Test and Evaluation (T&E)
- Child Accomplishment: Program Management/Systems Engineering
- Child Cost Item: 02db9ab0271394993f8a58e9a3debd72
- Child Cost Item: 55cb9376b7c894dec11dae085e340772
- Child Cost Item: 7a71f2a2cc2edf59a8ba3d028a81192d
- Child Cost Item: 4557a852428eb7abd485a51fbb823413
- Child Cost Item: 555c1b44abf30310c1868d8ab16edacb
- Child Cost Item: 63019eaa2553b3215b922674024506e1
- Child Cost Item: eabffa650c043393e5115def58d15a35
- Child Cost Item: de0b185fe0aa9936613b790c843add17
- Child Cost Item: fa9f2b3f2f9d4c80f6d4e8bfa0d4c3fc
- Child Cost Item: b19444f7f526c8e6ce237dbdd5ba0611
- Child Cost Item: ae6e4a31d03616a975a94d265a597bd8
- Child Cost Item: 79c6b1ba749b6de616113d216d516ab0
- Child Cost Item: d0610779e66bd4657004b0bdf17771f2
- Child Project: Common Helicopters
- Child Accomplishment: Product Development
- Child Accomplishment: Test and Evaluation
- Child Cost Item: dbb411eaca8d41b772dbfa0e7716028b
- Child Cost Item: 801c9c23b07e8a2be0f3e6e926f64489
- Child Project: Congressional Adds
- Child Cost Item: b92182a1738f966d1f6679fc324a0c1b
- Child Cost Item: 082ec0428b8b3594305b5ccce531d7f9
- Child Cost Item: 5a6fa4ee82d76222ad3588190babdb95
- Child Cost Item: ff3df1666161a0426cc6263664a8590a
- Child Cost Item: 8aca2b19bb276a0f9f628171bb236d38
- Child Cost Item: 7b33c4952f896357b8e6a4d5ea42b20a