(U)Common Avionics
Abstract
This project provides for the identification, study, design, development, demonstration, test, evaluation, and qualification of standard avionics capabilities for Navy use, and wherever practicable, use across all Services and Foreign Military Sales. Such air combat electronics developments include communications and airborne networking, navigation and sensors, flight avionics, safety systems, and flight mission information systems for both forward fit and retrofit aircraft. These efforts continue to maintain federated systems while encouraging transition of procurements to support a modular system for enhanced performance and affordability. Consideration is given up front to reduce acquisition costs through larger procurement quantities that satisfy multi-aircraft customer requirements and that reduce life cycle costs in the areas of reliability, maintainability, and training. Digital Warfare(DW) supports systems of systems requirements modeling and allocation, development of data technical baselines, digital architectures and data models, and provides data science for enterprise and warfare pilots in support of a composable, modular Navy. DW efforts in FY19 and out have been consolidated and realigned into PE 0604027N Digital Warfare. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production decision.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2019
- Source ID
- 0605217N_5_1319_PB_2019
- Change Summary Explanation
- Technical: Not applicable. Schedule: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM): CH-53K Integration/Certification of 8.33 kHz, Mode S, Reduced Vertical Separation Minimums (RVSM), Required Navigation Performance/Area Navigation (RNP/RNAV), and Automatic Dependent Surveillance-Broadcast Out (ADS-B (Out)) effort slid to 1Q/18 due to FY17 Congressional adjustment. Evaluate ADS-BO technologies/develop solutions to support platform integrations and develop CNS/ATM Common Component to support RNP/RNAV developmental platform requirements extended to 4Q/23. Tactical Communications: Extended Transmission Security (TRANSEC) and Crypto Modernization (Suite B) to 4Q/23. Added NSA Certification 5 to 3Q/23 and added OFP Software Production Milestone to 1Q/23. SATCOM S/W Development with Mobile User Objective System extended to 2Q/19 due to the additional qualification testing that is required for MUOS. Ground Proximity Warning System/Terrain Awareness System (GPWS/TAWS II): Edits made to schedule to incorporate changes in schedule dates to align to both V-22 and H-60 platforms' schedules; extended H-60 TAWS II Software Development completion date to 4Q/17; added H-60 TAWS II IOC 2Q/19; shifted V-22 TAWS II Requirements Development from 1Q/18 to 2Q/19; added TAWS II Software Re-Architecture 1Q/18 to incorporate MIL-STD 882E Level 1 requirements; Shifted V-22 TAWS II Software Development from 1Q/19 to 1Q/20; added V-22 Integration contract in 3Q/20; shifted V-22 TAWS II Developmental Test from 1Q/21 to 4Q/21. Collaborative Warfare (CW): Naval Aviation Netted Sensors and Maritime Targeting Experimentation, Naval Aviation and Maritime Targeting Requirements and CONOPS, Standards and Architectures/Requirements Development all extended to 4Q/23. Mid Air Collision Avoidance Capability: Budget realigned FY18-FY23 per the Office of the Chief of Naval Operations (OPNAV) direction. Added Analysis of Alternatives for 1Q/19, added DoD Architectural Framework Development 1Q/18, added Model Based Systems Engineering (MBSE) 1Q/18, extended Phase 2 Risk Reduction for Prototyping of Algorithms and Software extended to 4Q/23. MDD/ASR shifted from 2Q/18 to 4Q/22, RFP Release Decision shifted from 2Q/19 to 2Q/23 , added Draft CDD Submitted for 2Q/22, added CDD Approved 2Q/23, Integrated Logistics Assessment shifted from 3Q/19 to 3Q/23, Milestone B shifted from 4Q/19 to 4Q/23. The following were deleted: SRB/SRR 1Q/19, Phase 2 Spec Development 1Q18, SFR 2Q/19, PDR 3Q/19, Software Design and Development 1Q/20, CDR 3Q/20, Platform Integration and Test Support 3Q/21, MH-60R/S DT 3Q/22, and TRR 3Q/22. (U) Common Avionics schedule FY16 and prior is reflected in PE 0604215N, Project Unit 0572. 3425: Digital Warfare (DW) stood up separately within Program Element to set requirements, prioritize resources, and lead efforts on information interoperability and human/machine teaming starting 1QTR FY18 through the FYDP. DW efforts in FY19 and out have been consolidated and realigned into PE 0604027N Digital Warfare. Project Unit 0572 JT Service/NV Std Avionics CP/SB: The FY 2019 funding request was reduced by $2.500 million to account for the availability of prior year execution balances.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: JT Service/NV Std Avionics CP/SB
- Child Accomplishment: Joint Service Review Committee for Avionics Standardization (JSRC-AS)
- Child Accomplishment: Communication Navigation Surveillance/Air Traffic Management (CNS/ATM)
- Child Accomplishment: Tactical Communications (TACCOM)
- Child Accomplishment: Ground Proximity Warning System/Terrain Awareness Warning System (GPWS/TAWS II)
- Child Accomplishment: Collaborative Warfare (CW)
- Child Accomplishment: Avionics Component Improvement Program (AvCIP)
- Child Accomplishment: Mid Air Collision Avoidance Capability (MCAC)
- Child Accomplishment: Avionics Architectures Team (AAT)
- Child Cost Item: f54b658710a08c3982ff6e925d426091
- Child Cost Item: 92b5f877555ab9a4f7a295a9eeb8f28b
- Child Cost Item: 59fbe89ffc9f8333b2343bc41cefc684
- Child Cost Item: d0abeb70bc9596469ab2104959d13ed2
- Child Cost Item: 655f29e41c1d22411a52e56f58f44d3e
- Child Cost Item: 9f5a3c2c35cab10b058fcce55ef5f263
- Child Cost Item: ccdc2a93438ab711d3448fe742d78fbd
- Child Cost Item: f34ba381ae7df06ee0f12d870f10af23
- Child Cost Item: b55985d5f0f8c9234fae153a22e8a992
- Child Cost Item: 7874c1f2169bc65f3ac0eed1cc715c7e
- Child Cost Item: d5f8ee8beed87e125c346e79f2a5631e
- Child Cost Item: c83d3fd17705f89c3c4a3e15ffc298fa
- Child Cost Item: 10a8721b1fde7e1912aa69eeec3e1ef0
- Child Cost Item: 7e76ff70055e18effab4fbbf1a351c81
- Child Cost Item: ab980482af149f2a5cf3382ba7bfe8be
- Child Cost Item: ef590474df1a92ff97fa62a783b795b7
- Child Cost Item: 8340d04f81d71651c0375d34de458525
- Child Cost Item: f73a5abcfc88a3fd04137163a5415a1b
- Child Cost Item: 358577dd2796320466cffd7b3781c2d3
- Child Cost Item: 86555b896796ddb088f6023eebd74a3a
- Child Cost Item: 9c59e36573481d04f635234f0823cf36
- Child Cost Item: 5f3ebb79354b2b089393fad2acd8b301
- Child Cost Item: 5fb5e21f5aa071b36e67db0228ed6563
- Child Cost Item: fe81d213f77f67b8fee95087119b2402
- Child Cost Item: 612e58bd0b7ba870687dde23d87677e3
- Child Project: Digital Warfare
- Child Accomplishment: DIGITAL WARFARE
- Child Cost Item: f442a6adcf39aa8f097316ca1c0d2e16
- Child Cost Item: 0c87f4285ad4345808054d2f2841172f