Multi-mssn Maritime Aircraft (MMA) (P-8A)

Abstract

Decrease in MULTI-MSSN MARITIME AIRCRAFT(MMA)(P-8A) by $1.973M as required for the Department of the Navy to comply with the Bipartisan Budget Act of 2015. The FY 2017 funding request was reduced by $6.88M to account for the availability of prior year execution balances. The P-8A Multi-mission Maritime Aircraft will replace the aging P-3 aircraft. The P-8A program was initiated in response to the Joint Requirements Oversight Council (JROC) validated Mission Needs Statement, "Broad Area Maritime and Littoral Armed Intelligence, Surveillance and Reconnaissance" and the requirements for the program are defined in the P-8A Capability Production Document #791-88-09, validated and approved on 22 June 2009. A successful Critical Design Review was completed in June 2007. In August 2007 the Design Readiness Review was conducted and resulted in approval to obligate funding for the fabrication of the Stage II flight test aircraft. The first flight of P-8A occurred on 25 Apr 2009. Milestone (MS) C was successfully completed on 11 August 2010. The program completed Initial Operational Test and Evaluation (IOT&E) in March 2013 and achieved Initial Operational Capability (IOC) in November 2013. The Acquisition Decision Memorandum approved entry into Full Rate Production on January 3, 2014. The primary objectives of Systems Development and Demonstration (SDD) are to perform the system detailed design, develop and produce Systems Integration Labs, develop and build ground and flight test articles, and conduct ground and flight tests to successfully achieve program milestones. Ground testing includes the conduct of static testing, fatigue testing and Live Fire Test and Evaluation. Six flight test aircraft have been built during SDD (PU 2696). These test aircraft are grouped into two stages based on which phase of the test program the aircraft will support. SDD Stage I flight test aircraft (FY06/Qty-3) support Integrated Test and Evaluation (IT&E). SDD Stage II flight test aircraft (FY09/Qty-3) supported the completion of IT&E and Initial Operational Test and Evaluation (IOT&E) after being updated to the production configuration. The SDD contract includes the development and initial building of training devices to support IOT&E. The scope of SDD includes activities necessary to facilitate an efficient transition of the fleet to achieve the P-8A Initial Operational Capability (IOC) of SDD (PU 2696) in CY13. The scope of SDD also includes the engineering and verification of corrected deficiencies identified in testing and Fleet operational use. P-8A entered Production and Deployment phase in the 4th quarter of FY10 and entered Full Rate Production in 2nd quarter of FY14. P-8A program is based on an evolutionary acquisition strategy consisting of sequential incremental enhancements to system capabilities that will retain cost-wise effectiveness for winning major combat operations. In order to pace the threat, Spiral One (Increment 2), the Next Phase of Capabilities, will incorporate the following capabilities into the P-8A: Multi-Static Active Coherent (MAC), Automatic Identification System, Rapid Capabilities Insertion (RCI), updates to the Tactical Operations Center (TOC), as well as additional Anti-Submarine Warfare (ASW), Anti-Surface Warfare (ASuW) and Intelligence Surveillance and Reconnaissance capabilities as Engineering Change Proposals (ECPs). The scope of this effort includes the integration, design, ground testing (lab & aircraft) and flight test of the capability enhancements to the P-8A and associated Tactical Operations Center ground support facilities and initial trainers. Integration and test of these capabilities as well as integration of Advanced Airborne Sensor (AAS) capability will be accomplished incrementally, based on the scope of the integration effort. This includes support of Special Mission Configuration Test Program (SMCTP). The P-8A Spiral Two (Increment 3) program consist of sequential incremental enhancements to system capabilities that will retain cost-wise effectiveness for major combat operations. Increment 3 will incorporate improvements to aircraft systems including Combat System architecture improvements, ASW and ASuW sensor improvements, communication capability upgrades, ASuW Net Enabled Weapon (NEW), Higher-Than-Secret (HTS) security capability, and High Altitude ASW Weapons Capability (HAAWC) with datalink. Increment 3 has transferred from this PE 0605500N to PE 0605504N. The P-8A Multi-mission Maritime Aircraft (MMA) program also includes a sequence of RCI's and rapid development efforts to respond to evolving threats which will retain cost-wise effectiveness for winning major combat operations. In order to pace the threat, these efforts will incorporate incremental software and hardware improvements to existing sensors, communications systems, mission systems, weapons capabilities and Tactical Operations Center (TOC) to build on the P-8A capability baseline. These capabilities, and other emergent capability requirements, will be prioritized through the Navy Integration and Interoperability (I&I)-aligned Capability Prioritization Process (CPP) and P-8A Tier 3 Capability Roadmap. The CPP process will be supported by detailed analysis and the maturation of developing technologies. Budget Activity 5. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2017
Source ID
0605500N_5_1319_PB_2017
Change Summary Explanation
Technical: Not applicable. Schedule: Project 2696: In order to clarify and better portray the actual work being performed: removed Production & Deployment line and Integrated Test & Evaluation line; renamed Correction of Deficiencies/Air to Air Refueling to Air to Air Refueling and renamed Fatigue Testing to Fatigue Testing/Air to Air Refueling and moved from Operational Evaluation to Technical Evaluation; removed FOT&E periods 2 and 3. Project 3181: Due to delays in scheduled testing as a result of other higher priority test events; extend DT/IT from 2QFY15 to 2QFY16; move OT&E (IOC) start from 4QFY15 to 3QFY16 and end from 2QFY16 to 4QFY16; extend Integration EMD from 2QFY16 to 4QFY16. To coincide with the actual kit deliveries and installations, changed Kit Deliveries (APN) start date from 2QFY15 to 4QFY15 and end date from 1QFY18 to 3QFY17. Project 3218: Funding transferred from PE 0605500N to PE 0605504N.
Service Agency Name
Navy

Entities

Organizations

  • United States Navy

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Acquisition
  • Antisubmarine Warfare
  • Automatic Identification Systems
  • Combat Operations
  • Contracts
  • Cost Analysis
  • Deployment
  • Engineering
  • High Altitude
  • Horizontal Stabilizers
  • Identification Systems
  • Intelligence Surveillance And Reconnaissance
  • Product Development
  • Software Development
  • Submarine Warfare
  • Surveillance
  • Test And Evaluation

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • 5G
  • 5G - DoD 5G Program

Related Documents