(U)CARRIER ONBOARD DELIVERY (COD) FOLLOW ON
Abstract
Funding supports the Engineering Analysis for development of an Engineering Change Proposal to modify an MV-22 into the C/MV-22 configuration to perform the COD mission. The Engineering Analysis will provide a proposed solution(s) to add (1) external conformal fuel tanks to provide the capability to meet the range requirements that the COD mission demands (2) an HF radio to transmit/receive beyond line of sight over water and (3) a Public Address system for use while transporting passengers. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under OPERATIONAL SYSTEMS DEVELOPMENT because it includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate funding in the current or subsequent fiscal year. Due to the timing of the H.R. 2029, FY15 does not reflect Title VIII General Provisions which rescinded $5.032M.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2017
- Source ID
- 0605525N_7_1319_PB_2017
- Change Summary Explanation
- Technical: Not applicable. Schedule: Not applicable.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Carrier Onboard Deliver Recapitalization
- Child Accomplishment: Carrier Onboard Delivery Recapitalization
- Child Cost Item: 0b3fb868b0ae6121dc49e865c41adb24
- Child Cost Item: df3c3d1910cc2c2683797af34b3749b5
- Child Cost Item: ba9e57aaad704396f168a893dabdc27a