National Capabilities Integration (MIP)
Abstract
Tactical Exploitation of National Capabilities (TENCAP) exploits national capabilities to pace evolving threats in support of operations during conflict and competition. TENCAP systems and technologies provide deep sensing to support commanders' situational understanding (patterns of life, threat intentions, etc.), indications & warnings (detection of enemy mobilization and hostile activity), and intelligence support to targeting (order of battle, electronic target folders, target detection, Battle Damage Assessment, etc.). TENCAP systems and technologies support Theater-level fires and effects, TENCAP systems enable integrated Signals Intelligence (SIGINT) / Electronic Warfare (EW) / and Cyberspace operations. TENCAP supports Army modernization priorities including Long Range Precision Fires, Assured Position Navigation and Timing/Space (PNT/S), Future Vertical Lift (FVL), and Air Missile Defense (AMD). In summary, TENCAP is a key enabler to defeating peer competitor Anti-Access / Area-Denial (A2/AD) strategies. This Program Element includes three separate projects described below. 1. Tactical Intelligence Targeting Access Node (TITAN) (BV3) - This project includes funding for system integration and testing of the TITAN (space) Pre-Prototype that will provide specific Army units with assured access to space-based Intelligence, Surveillance, and Reconnaissance (ISR) sensor data from Commercial and National levels. The follow-on effort to the TITAN (space) Pre-Prototype is testing and integration of the Space Ground Component Kit (SGCK) into the TITAN Program of Record. The SGCK consists of antennas, other RF components, and other capabilities developed as part of the TITAN (space) Pre-Prototype effort. 2. National Integration to Tactical Systems (DX9) - This project enables the Army's Tactical Exploitation of National Capabilities (TENCAP) office to monitor, synchronize, and transition proven, advanced technologies, prototypes and standards, developed by the National Intelligence Community (IC), into Army systems and Programs of Record during the most cost-effective, early stages of development. 3. Air Vigilance (AV) Program of Record (POR) (EX7) - This project provides System Development and Integration funds for the classified POR.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2024
- Source ID
- 0605766A_5_2040_PB_2024
- Change Summary Explanation
- Decreased funding to support higher Army priorities.
- Service Agency Name
- Army
Entities
Organizations
- United States Army
Related Documents
- Child Project: Technical Intel Targeting Access Node (TITAN)
- Child Accomplishment: BV3 / Tactical Intelligence Targeting Access Node (TITAN) Prototype System
- Child Cost Item: 9d0dfa409668f06a8a12460fc04fd290
- Child Cost Item: c6b9d828c3b899ca4eb104a8a321fce2
- Child Cost Item: dc4a97965ec5f1e95022457b71a48f07
- Child Cost Item: 5cc5778a028025607d38adf1020fe7a0
- Child Project: National Integration To Tactical Systems
- Child Accomplishment: National Integration to Tactical Systems
- Child Accomplishment: TENCAP Radio Frequency Exploitation (TRFE)
- Child Cost Item: 335ea2fe1221c67114da03f4a355b50c
- Child Cost Item: 04fb6ee5184a50cbc95b6480bad8531a
- Child Cost Item: b218936c5975c27a010d1ed526903697
- Child Cost Item: 7425e8d80e3796fd1129df6981ff548a
- Child Cost Item: 14d3dccc634fe615f93b09b44fc07c3f
- Child Cost Item: 0bdf963507619e7e461860e73343d60c
- Child Project: Air Vigilance System Development
- Child Accomplishment: Air Vigilance System Development and Integration
- Child Cost Item: b65e969505c8677f9acf8183d620bb02
- Child Cost Item: 0eba6ed4c31b82226d5f40bee9c5de67
- Child Cost Item: 376af2c6d041a127e2b38e45774cf508
- Child Cost Item: a99443c309d123d29ca59ab9f8378269