Support Systems Development
Abstract
This program element supports two active projects, 3318 and 5042, and a third, 5044, provides a budgetary accounting location for projects funded through Congressional interest. Product Data System Modernization (PDSM), (project 3318), upgrades Air Force digital data standards to commercial industry standards supporting the Joint Computer-Aided Acquisition Logistic Support (JCALS) System. Logisitics Application Logistics Integration (LALI), (project 5042), is the effort to migrate existing Installations and Logistics (IL) legacy systems to the common Global Combat Support System - Air Force (GCSS-AF) Integration Framework (IF). Logistics Systems Development (LSD), (project 5044), provides a budgetary accounting location for various projects having Congressional interest. This program is a Budget Activity 7, Operational System Development, because projects are being engineered to support already operational weapon systems.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2011
- Source ID
- 0708611F_7_3600_PB_2011
- Change Summary Explanation
- In FY 2009, Congress added $38.8M to PE 78611F for tasks that were placed in project 5042 but were for non LALI activities. $31.04M of these funds were moved out of PE 78611F via technical adjustment; $29.6M was moved to PE 72976F and $1.44M was moved to PE 33141F. The tasks moved to PE 72976F include: Expeditionary 200 kW+ Alternative Power Generator ($0.8M), Alternative Energy Fuel Cell Power ($1.6M), Assessment of Alternative Energy for Aircraft Ground Equipment ($1.6M), Eielson AFB Alternative Energy Source Program ($2.4M), Freedom Fuels/Coal Fuels Alliance ($3.2M), and Alternative Energy Research ($20.0M). The task moved to PE 33141F is Technical Order Modernization Environment ($1.44M). The remaining $7.76M of these funds will be executed out of PE 78611F Project 5042. These tasks include: WR-ALC Strategic Airlift Aircraft Availabliltly Improvement ($3.360M), Micro-Grid Energy Storage Utilizing a Deployable Zinc-Bromide Flow Battery ($1.6M), Accelerator-Driven Non-Destructive Testing ($2.0M), and Warner Robbins Air Logistics Center Special Operations Forces ($0.8M). The AF will direct these funds to the correct program office for execution. Reductions in FY09 as a result of higher AF priorities. In FY 2010, $31.970M to PE 78611F for various projects having Congressional interest. These Congressional interest projects include ALC Logistics Integration Environment ($0.8M), Accelerator-Driven Non-Destructive Testing ($2.0M), Alternate Energy Research and Integration ($18.450M), Assessment of Alternate Energy for Aircraft Ground Equipment (AGE) ($1.6M), Demonstration and Validation of Renewable Energy Technology ($0.8M), Engine Health Management Plus Data Repository Center ($2.4M), Freedom Fuels/Coal Fuel Alliance ($3.920M), Mitigating RoHS Lead-Free Issues in Aerospace Circuit Board Manufacturing ($0.8M), Technical Order Modernization ($1.2M). The Air Force will direct these funds to the correct program office for execution. In FY 2011: The FY 2010 President's Budget submittal did not reflect FY 2011 through FY 2015 funding. Therefore, explanation of changes between the two budget positions cannot be made in a relevant manner.
- Service Agency Name
- Air Force
Entities
Organizations
- United States Air Force
Related Documents
- Child Project: Product Data Systems Modernization (PDSM)
- Child Accomplishment: MAJOR THRUST: Air Force Technical Order functionality implementation of Enhanced Technical Information System (ETIMS) Enterprise.
- Child Cost Item: 01b28e1a04bd313905c5d65df71b9768
- Child Cost Item: 1878f93b80872980e42d7a8e6b417d6a
- Child Cost Item: d27853e173fa81364af95bf5890fa4e5
- Child Project: Log Application Logisitics Integration (LALI)
- Child Accomplishment: MAJOR THRUST: Logistics Application Logistics Integration (LALI) project
- Child Cost Item: 42ceba84292b4ca2ae15e2b48aa077e4
- Child Cost Item: d6dba6b9ab1126ee29ed389d755aba9b
- Child Cost Item: b71c59c48bbc5c0865d401dfbd5acdf1
- Child Cost Item: b9458afac0391a46fbecfaa6a8bf629f
- Child Cost Item: b8d8977393001e508ffecdfe7b334c13
- Child Cost Item: 8563745711649632836fdee5f308f63f
- Child Cost Item: 2a0ba313ddbad300affa1ef5724e410c
- Child Cost Item: 7356b8e7561ddada957ebbb2c323038b
- Child Cost Item: 2a8e381d25ab0c83746213ee31bf16d1
- Child Cost Item: f252314859ea766a31e65a3a2ae249f7
- Child Cost Item: 1ebd78943fd68123aba53311f5189243
- Child Cost Item: 79766235bf68fa495ab8ccc79df6c9d8
- Child Cost Item: bfe9724bace604c3e02060a7c67f20af
- Child Cost Item: b061e2079e1adbff0d07bb649897770e
- Child Cost Item: 8198e2d9d30ed797c593a74166aadfc6
- Child Cost Item: 07db6441da2a0b1de6e2f03cc88c8918
- Child Cost Item: 389711a4189beef198cc5d66c94f1c3e
- Child Project: Logistics Systems Development (LSD)
- Child Cost Item: 1de1e4833a9cb1cf5e982857cadeae55
- Child Cost Item: 6ddb6a63181930477f13e09aa680a439
- Child Cost Item: f47fe82f31e0e2f59f0413db2d29ff1c
- Child Cost Item: 3a83a958caf7a1ec8ad996cd9e38eb46
- Child Cost Item: 9c1487f069716a4dd7f1de70e197b1c1
- Child Cost Item: 4c2e006b4b7eb0ab8e4911be0c421165
- Child Cost Item: 28863a94972e5788916dfeb2f9df0e46
- Child Cost Item: 72eafb287be1138c38a8f1a3c526ea6b
- Child Cost Item: 7bf7731b64a2fffbeeb641f4f05d6260