Support Systems Development

Abstract

This program element supports two active projects, 3318 and 5042, and a third, 5044, provides a budgetary accounting location for projects funded through Congressional interest. Product Data System Modernization (PDSM), (project 3318), upgrades Air Force digital data standards to commercial industry standards supporting the Joint Computer-Aided Acquisition Logistic Support (JCALS) System. Logisitics Application Logistics Integration (LALI), (project 5042), is the effort to migrate existing Installations and Logistics (IL) legacy systems to the common Global Combat Support System - Air Force (GCSS-AF) Integration Framework (IF). Logistics Systems Development (LSD), (project 5044), provides a budgetary accounting location for various projects having Congressional interest. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2012
Source ID
0708611F_7_3600_PB_2012
Change Summary Explanation
In FY 2010: $31.8M was added to PE 78611F for various projects having Congressional interest. $24.7M of these funds were moved out of PE 78611F via reprogramming to PE 72976F. The projects moved to PE 72976F include: Demonstration and Validation of Renewable Energy Technology ($0.8M), Alternate Energy Research and Integration ($18.4M), Assessment of Alternate Energy for Aircraft Ground Equipment (AGE) ($1.6M), Freedom Fuels/Coal Fuel Alliance ($3.9M). The remaining $7.2M of these funds will be executed out of PE 78611F Project 5044. These projects include: ALC Logistics Integration Environment ($0.8M), Accelerator-Driven Non-Destructive Testing ($2.0M), Engine Health Management Plus Data Repository Center ($2.4M), Mitigating RoHS Lead-Free Issues in Aerospace Circuit Board Manufacturing ($0.8M), Technical Order Modernization ($1.2M). The Air Force will direct these funds to the correct program office for execution. In addition, $3.9M was added to Project 675042 Logistics Analysis Logistics Integration (LALI) to initiate the Civil Engineer's (CE) Information Technology (IT) Transformation effort to transform CE's business processes to better serve the CE customers and meet Air Force Transformational Goals. In FY 2011: No program adjustments. In FY 2012: $5.8M was added to Project 675042 LALI to initiate and implement planned legacy system development for the Integrated Maintenance Data System (IMDS) and other outdated legacy logistics information technology systems which must be replaced, modified, or upgraded to sustain these systems for the warfighter.
Service Agency Name
Air Force

Entities

Organizations

  • United States Air Force

Tags

Communities of Interest

  • Air Platforms
  • Biomedical
  • Counter WMD
  • Space

DTIC Thesaurus Topics

  • Acquisition
  • Air Force
  • Best Practices
  • Business Administration
  • Circuit Boards
  • Combat Support
  • Computing System Architectures
  • Cost Analysis
  • Digital Data
  • Engineering
  • Information Systems
  • Logistics
  • Product Development
  • Storage
  • Systems Engineering
  • Test And Evaluation
  • Warfare

Fields of Study

  • Engineering

Readers

  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.
  • Logistics and Supply Chain Management.
  • Software Engineering.

Related Documents