Support Systems Development
Abstract
This program element supports an active project, Logistics Application Logistics Integration (LALI), and a project, Logistics Systems Development (LSD), that provides a budgetary accounting location for projects funded through Congressional interest. Logisitics Application Logistics Integration (LALI), (project 675042), includes Logistics, Installations and Mission Support – Enterprise View (LIMS-EV) the effort to provide integrated “one-version-of-truth” information from multiple source systems through the Global Combat Support System - Air Force (GCSS-AF) Integration Framework (IF) to Air Force strategic to tactical level decision makers. Logistics Systems Development (LSD), (project 675044), provides a budgetary accounting location for various projects having Congressional interest. A third project, Product Data System Modernization (PDSM), project 673318, is an effort to upgrade Air Force digital data standards to commercial industry standards supporting the Joint Computer-Aided Acquisition Logistic Support (JCALS) System. In FY 2013, project 673318, Product Data System Modernization (PDSM), efforts transferred from PE 0708611F, Support Systems Development, to PE 0708012F, Logistics Support Activities, in order to better align the fielded and operational PDSM project within the more appropriate PE 0708012F Logistics Support Activities. Activities also include studies and analysis to support both current program planning and execution and future program planning. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2013
- Source ID
- 0708611F_7_3600_PB_2013
- Change Summary Explanation
- In FY 2011: $34.695 was added to the program. $32.0M of these funds were for a project having Congressional interest, Alternative Energy Research, located in project 675044, Logistics Systems Development (LSD). $2.227M of these funds were to replace expired FY10 funding for a project having Congressional interest, Engine Health Management Plus Data Repository Center (EHMPDRC), located in project 675044. The remaining $0.468M was for for the Logistics Installations and Mission Support - Enterprise View (LIMS-EV), Ammunition Data System, and Civil Engineer's (CE) Information Technology (IT) Transformation efforts in project 675042, Logistics Application Logistics Integration (LALI). In FY 2012: $40.000 was added to the program for a project having Congressional interest, Alternative Energy Research, located in project 675044, Logistics Systems Development (LSD). In FY 2013: $10.076 was added to project 675042, Logistics Application Logistics Integration (LALI). $6.326 is for planned LIMS-EV projects to develop Business Intelligence capabilities to enable Air Force logistics transformation initiatives and modify existing LIMS-EV capabilities to consume data from the Expeditionary Combat Support System (ECSS) instead of legacy systems subsumed by ECSS. The remaining $3.750M will be used to develop the data transfer capability of the F-35 Autonomic Logistics Information System (ALIS) integrate F-35 data with existing enterprise views and capabilities.
- Service Agency Name
- Air Force
Entities
Organizations
- United States Air Force
Related Documents
- Child Project: Product Data Systems Modernization (PDSM)
- Child Accomplishment: ETIMS
- Child Project: Log Application Logisitics Integration (LALI)
- Child Accomplishment: Logistics Application Logistics Integration (LALI)
- Child Project: Logistics Systems Development (LSD)
- Child Accomplishment: Engine Health Management Plus Data Repository Center (EHMPDRC)