Sub Integrated Ant System
Abstract
The Submarine Integrated Antenna System project (0742) provides for the development and testing of submarine antennas designed to meet emerging submarine requirements of: (a) Improved frequency coverage and data rate capabilities of submarine antennas and their interface to the External Communications System, (b) Improved submarine antenna performance and data rate while the submarine is operating at speed and depth, (c) Antenna compatibility with new waveforms and transceiver equipment, (d) Improved stealth capability of existing and future antennas and (e) Improved antenna design to reduce Total Ownership Cost. This project funds research and development for submarine antennas including (1) Pre-Planned Product Improvement (P3I) efforts to existing antennas including Outboard Electronics (OE)-538/BRC Multi-Function Antenna, (2) OE-562 Submarine, High Data Rate (SubHDR) system development of components for reliability improvements, (3) Development of new systems including Advanced High Data Rate (AdvHDR), and (4) Commence support of Submarine Communications Buoy (SCB) Project Arrangement with United Kingdom (UK). The efforts listed above will provide Ship Submersible Nuclear (SSN), Ship Submersible Ballistic Nuclear (SSBN) and Ship Submersible Guided Nuclear (SSGN) platforms with improved communications capabilities to support future Joint, Allied, and Naval operations. JUSTIFICATION FOR BUDGET ACTIVITY: This project is funded under ENGINEERING AND MANUFACTURING DEVELOPMENT because it encompasses engineering and manufacturing development of new end-items prior to production approval decision. Notes/Comments: FY13 OE-538: Complete Developmental Test (DT) and Operational Assessment (OA), continue development/update of required Milestone C acquisition documents, and complete additional EDM procurement. FY13 SubHDR: Continue development of components identified by research and analysis. Complete UNDEX development and testing. FY13 Advanced High Data Rate (AdvHDR): Continue risk mitigation demonstrations and technology maturation efforts towards technology readiness assessments in preparation of Advanced Development Model (ADM) Demonstration. FY13 Submarine Communications Buoy (SCB): Continue support for SCB Project Arrangement with United Kingdom and continue providing program, contract, and system engineering management support for Submarine Communications Buoy.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2013
- Source ID
- 0742_0604503N_5_1319_PB_2013
Related Documents
- Root: SSN-688 & Trident Modernization
- Child Accomplishment: Antenna Transition Engineering
- Child Accomplishment: Outboard Electronics (OE)-538
- Child Accomplishment: Submarine High Data Rate (SubHDR) Pre-Planned Product Improvement (P3I)
- Child Accomplishment: Advanced High Data Rate (AdvHDR)
- Child Accomplishment: Submarine Communications Buoy (SCB)
- Child Cost Item: 6c3db816cedcf920c45f288600799aba
- Child Cost Item: b71202cc1a879576d367d3f23aaf3c53
- Child Cost Item: 7bcdd6006d8a151dab8a797aa087d18e
- Child Cost Item: 9923b95aca3c3b164cf4bdba517d5ae6
- Child Cost Item: b3398375111e9de45e037fd0555242b2
- Child Cost Item: 255457e4147fd02b4fe48e771e5fce7a
- Child Cost Item: a16bb48cfaf5c46924901bad16caae56
- Child Cost Item: 57ef837f42301d0017fa138f328e5328
- Child Cost Item: 70dba23069e9c423c280f9312f11037e
- Child Cost Item: 6005033a88d136564796ce96ae714e28
- Child Cost Item: babb3eb70a12104fc4489c57c1b3a5f1
- Child Cost Item: 02240c30da9c1ae6da6118b1d97d3090
- Child Cost Item: 8b005116a292c7d19f1394866ed28fb3
- Child Cost Item: dda2582bef8bda4ba49172db5983aa7c
- Child Cost Item: f9324d8f80003488332be1750fe36024
- Child Cost Item: 7e439f79154d477273188e26e7b303a8
- Child Cost Item: b54437705cdf2e2c02b7b2364f7c3aba
- Child Cost Item: f64aecb53efaf9ed7e497814f175bba8
- Child Cost Item: 723514f8a3a8c5c038691544076d81eb
- Child Cost Item: da9922ab58c5f0ca4399154b8c95801f
- Child Cost Item: 7ffc8d156a4ae0012ee5d11410f595a1
- Child Cost Item: 60739eeabe6e650e2345fdc810af4dad
- Child Cost Item: de591289442768c964bcc3c7bf5317a7
- Child Cost Item: 9afb72a888506e4f2a5fa63712d0a9a9
- Child Cost Item: 37150848d58ebde7c916d278d6a4a60e
- Child Cost Item: be12fc891aad7d95d6fb9537598b83d9
- Child Cost Item: 525146790928f2d56e1f2e79e282361d
- Child Cost Item: b62ca074e46c6eaf88b82e0e30a75828
- Child Cost Item: 1e6050ba86eb10e9285290a51f712e6e
- Child Cost Item: 325446669c52ea1818e90e9949e369db
- Child Cost Item: 24a7606fd75ca91f47638f3ebf8e582f
- Child Cost Item: 9aac907a9be53a4a18734441bca569b3
- Child Cost Item: 2a75d35094f8ed1ace546d23522359c3
- Child Cost Item: 4109b0f1eb496b6d1146a7d8ce3aa28c
- Child Cost Item: 6b2f3719a55c6a25415090923a26026f
- Child Cost Item: 7970dd61acf7f1982422c2cd35439841
- Child Cost Item: f306aa30d6cf7cf6d5945a80f69be8ef
- Child Cost Item: 3f102a93968d1e1ae91dd99ffa36d148
- Child Cost Item: 0968dd6a0d7b7d5d5f27fc7c0af245ba
- Child Cost Item: 450653a2650474569e99c3ba9393a9d4
- Child Cost Item: d64818a27c4a576225e046d6df53f30a
- Child Cost Item: c0d931f4983826a6f65cdff899d4ad52
- Child Cost Item: 4f30463db161de9548219d314f756e70
- Child Cost Item: 65a36d411a0d80a85a62856e4ade6568
- Child Cost Item: b0fe99a12bc210562d5c96df92f1cada