Predictive Logistics (PL) Data Integration Ground Systems (DIGS) Development
Abstract
Development of PL Engineer Change Proposals (ECPs) to enable the Tactical Wheeled Vehicle fleet to transition from time-based/conditioned-based maintenance to the ability to act prior to material failure.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2025
- Source ID
- 0879f729c09d0ce0b5e16613f9224f57