GTCP36 Auxiliary Power Unit (APU)

Abstract

Provide timely responses to technical problems arising in the field during operational use. Review operational and repair reports, perform engineering analysis of failed engines and equipment. Perform investigation and testing as required to isolate/verify reported field problems and service revealed deficiencies (SRDs).

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2013
Source ID
097d1bdeadc230dc55e60141741cf3a4

Tags

Fields of Study

  • Engineering

Readers

  • Electrical Engineering
  • Instructional Design and Training Evaluation.
  • Systems Analysis and Design

Related Documents