Ground Test Execution
Abstract
Ground Test Execution includes: - THAAD participation in MDA Ground Test operational scenario events to ensure THAAD's ability to conduct coordinated engagements with Aegis and PATRIOT operating with C2BMC and AN/TPY-2. - Pre-mission planning, pre- and post-mission analyses, reporting, and execution to support BMDS Ground and Flight Test campaigns. - Provide ground test of element hardware and software prior to hardware-in-the-loop (HWIL) testing and enable a continuous capacity based Sprint vs. lengthy individual Ground Test (GT) campaign environment, enabling a more efficient process for ground testing and reducing test cycle time. - Continued performance assessments to evaluate system performance and interoperability within the integrated BMDS. Specific and/or unique planned accomplishments to each FY are as follows:
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2021
- Source ID
- 0bd4ea99477f4d99a2ca837bfd86c081