T62 Auxiliary Power Unit (APU)

Abstract

Provide timely responses to technical problems arising in the field during operational use. Review operational and repair reports, perform engineering analysis of failed engines and equipment. Perform investigation and testing as required to isolate/verify reported field problems and service revealed deficiencies (SRDs).

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
0cd03e2e1c37def8667716850a121990

Tags

Fields of Study

  • Engineering

Readers

  • Defense Financial Management and Audit.
  • Electrical Engineering
  • Facility/Structural Engineering.

Related Documents