Test and Evaluation
Abstract
Developmental Test activities in support of Block 4, to include Lockheed Martin and Pratt & Whitney support at both test sites. Non-recurring engineering required to plan for the service life extension of existing DT aircraft and modification necessary to bring DT aircraft fleet to a more production representative and sustainable configuration. Additional upgrades required to support development and evaluation of improvements driven by changes in the threat environment and as identified in the Electronic Warfare ICD, the Fifth Generation Fighter Modernization ICS, and the Block 4 Capability Development Document (CDD).
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2020
- Source ID
- 0fcc18ce4c366a4d2a0e6b39188370de
Related Documents
- Root: (U)F-35C C2D2