Preamble Initial Look Leading to Accelerated Results
Abstract
Develop capability to support a deployed engineering assessment team in the expedient recon and load-capacity determination of offload structures and plan/design required repairs.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2017
- Source ID
- 117ecb02c3cb2e4c13baecceee22895a