Contractor Prototypes
Abstract
Procurement and fabrication of subsystem test assets required by the Technology Development (TD) contract and for system level prototypes planned in the EMD phase. Does not include material consumed in support of component level engineering efforts.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2013
- Source ID
- 13ea72d2c58f3d22e89625d265d43bdd
Related Documents
- Root: Manned Ground Vehicle