Ground Test and Simulation Infrastructure (GTSI)
Abstract
Ground Test & Simulation Infrastructure capabilities from Block 4 early-on design and development through Installed Systems Verification activities prior to Developmental Flight Test for all variants of the F-35 aircraft. Infrastructure efforts include Laboratory Developments of Improvements & Modernization (I&M) assets used for design, development and test of Block 4 capabilities, and development of Ground Test & Evaluation Capabilities for digital and non-digital installed systems verification. Laboratory Developments will focus on the pure development of Block 4 capabilities through a Capability Verification Infrastructure that meets required fidelities that would advance the high quality development of the Air System capabilities. Ground Test & Simulation Infrastructure will also include capabilities for cyber testing for TR-3 assessments within three main areas: air vehicle, information systems, and supply chain.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2022
- Source ID
- 145ca9fc107e2cc318d97dfba737b5ed
Related Documents
- Root: F-35B C2D2