Abstract

Design, integrate and test modules to eliminate obsolete components in the LATR Pod. Design, integrate and test LATR software baseline upgrades. Design, integrate and test Participant Instrumentation Packages (PIP) modules to address obsolescence, high failure components and to improve operability and performance. Conduct and complete installation of the Ground System Rehosts. Conduct and complete security testing and assessment for LATR system certification and accreditation for Ground System Rehosts. Develop, test and integrate software and hardware modifications to system test sets. Develop LATR rotary wing re-size and LATR Datalink emulators. Develop, test and integrate LATR data translators. Conduct follow-on obsolescence studies to identify sub-projects required through FY16. Complete ground system and PIP refresh sub-projects, in conjuction with, semi-annual system block upgrades. Conduct LATR Operational Security (OPSEC) Posture Improvements Sub-Projects.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
14b4f15607ae9dd0e3aa6aa0cad48224

Tags

Fields of Study

  • Computer science
  • Engineering

Readers

  • Naval Mine Countermeasure Systems Development.

Related Documents