DASS

Abstract

MAJOR THRUST: GPS III space segment nonrecurring and recurring contract costs to add one DASS unit to each SV beginning at GPS IIIB and continuing through GPS IIIC (24 SVs total).

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
15194d052edcfd8c85a4563bf4892cfe

Tags

Readers

  • Aerospace Engineering.
  • Missile Defense Systems.

Technology Areas

  • Space

Related Documents