SDB II F-18 Integration

Abstract

The DON has adjusted the platform integration strategy by inclusion of Small Diameter Bomb II (SDB II) and the Joint Miniature Munitions Bomb Rack Unit (JMM BRU) on F/A-18 E/F to deliver the capability to the warfighter in light of continued F-35 program delays. This program funds the aircraft software and weapon testing required to successfully integrate SDB II/JMM BRU on the F/A-18 E/F to meet a FY 2020 Initial Operational Capability (IOC). The SDB II integration program began in FY 2014 with funding residing in PE 0204136N, PU 1662 F/A-18 Improvement.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2018
Source ID
1663_0604329N_5_1319_PB_2018

Tags

Readers

  • Military Logistics and Supply Chain Management
  • Military Science and Technology Research and Modernization.
  • Software Engineering

Related Documents