SDB II F-18 Integration
Abstract
Due to continuing delays in the F-35 program, the DON has adjusted the platform integration strategy by inclusion of Small Diameter Bomb II (SDB II) and BRU-55 on F/A-18 E/F to deliver the capability to the warfighter in light of continued F-35 program delays. This program funds the aircraft software, integration, and testing required to successfully integrate SDB II and BRU-55 on the F/A-18 E/F to meet a FY 2020 Initial Operational Capability (IOC). In order to meet the IOC, testing will be limited to the F/A-18 E/F midboard stations. Following midboard station testing, the program will test SDB II and BRU-55 on inboard stations and the SDB II and BRU-61 type II carriage system on midboard and inboard stations.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2021
- Source ID
- 1663_0604329N_5_1319_PB_2021
Related Documents
- Root: Small Diameter Bomb (SDB)
- Child Accomplishment: F/A-18 Integration
- Child Cost Item: cec6e7af7c38d1ecf1520da43fbbca74
- Child Cost Item: 44abda6d560c24543564b77a497aa059
- Child Cost Item: ee41fa92486ae9e3642b5edc49cce92d
- Child Cost Item: 5078c25cd952ff0bff361c948240fcd6
- Child Cost Item: a66b6c457466ba4021a13683622791e8
- Child Cost Item: a1fbcdfe049dd8a73b5e93f226bc2e5f
- Child Cost Item: f69556bf8b6d30456dbcf19007b4b7d1
- Child Cost Item: 0c12cde587d8e83f97bd7fedf7d507fa