SDB II F-18 Integration

Abstract

Due to continuing delays in the F-35 program, the DON has adjusted the platform integration strategy by inclusion of Small Diameter Bomb II (SDB II) and BRU-55 on F/A-18 E/F to deliver the capability to the warfighter in light of continued F-35 program delays. This program funds the aircraft software, integration, and testing required to successfully integrate SDB II and BRU-55 on the F/A-18 E/F to meet a FY 2021 Initial Operational Capability (IOC). In order to meet the IOC, testing will be limited to the F/A-18 E/F midboard stations and the flight envelope will be limited. Following limited envelope and midboard station testing, the program will test full envelope SDB II and BRU-55 on inboard stations and the SDB II and BRU-61 type II carriage system on midboard and inboard stations. Delays due to COVID and non-availability of aircraft and ranges, IOC slipped from FY 2020 to FY 2021.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2022
Source ID
1663_0604329N_5_1319_PB_2022

Tags

Readers

  • Munitions and Ordnance Engineering

Related Documents