SDB II F-18 Integration
Abstract
Due to continuing delays in the F-35 program, the DON has adjusted the platform integration strategy by inclusion of Small Diameter Bomb II (SDB II) and BRU-55 on F/A-18 E/F to deliver the capability to the warfighter in light of continued F-35 program delays. This program funds the aircraft software, integration and testing required to successfully integrate SDB II and BRU-55 on the F/A-18 E/F to meet a FY 2024 Initial Operational Capability (IOC). In order to meet the IOC, testing will be limited to the F/A-18 E/F midboard stations and the flight envelope will be limited. Following limited envelope and midboard station testing, the program will test full envelope SDB II and BRU-55 on inboard stations and the SDB II and BRU-61 type II carriage system on midboard and inboard stations. FY 2023 is the last year for funding this PU and Early Operational Capability (EOC) was declared October 2023, with IOC scheduled for March 2024.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2025
- Source ID
- 1663_0604329N_5_1319_PB_2025
Related Documents
- Root: Small Diameter Bomb (SDB)
- Child Accomplishment: F/A-18 Integration
- Child Cost Item: 64e2ad7e925fbc3b451fa722ba825d71
- Child Cost Item: 795f9cf33ae211885423959873c8acb3
- Child Cost Item: efd8ed6262f11bd3c178338b44fb531d
- Child Cost Item: 803581b5526a3c31a6c86d1984cd0387
- Child Cost Item: ebb3232c9b66ba8a29cf537b018b4cce
- Child Cost Item: b2861c1a2205f991242eec28c9847990
- Child Cost Item: d974fce2a87500fa70a49e1a10303cf1
- Child Cost Item: 0ea36d37e8e63827b923c2536d66355a
- Child Cost Item: 002811991af4805daab7e87b33c50435