SDB II F-18 Integration

Abstract

Due to continuing delays in the F-35 program, the DON has adjusted the platform integration strategy by inclusion of Small Diameter Bomb II (SDB II) and BRU-55 on F/A-18 E/F to deliver the capability to the warfighter in light of continued F-35 program delays. This program funds the aircraft software, integration and testing required to successfully integrate SDB II and BRU-55 on the F/A-18 E/F to meet a FY 2024 Initial Operational Capability (IOC). In order to meet the IOC, testing will be limited to the F/A-18 E/F midboard stations and the flight envelope will be limited. Following limited envelope and midboard station testing, the program will test full envelope SDB II and BRU-55 on inboard stations and the SDB II and BRU-61 type II carriage system on midboard and inboard stations. FY 2023 is the last year for funding this PU and Early Operational Capability (EOC) was declared October 2023, with IOC scheduled for March 2024.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2025
Source ID
1663_0604329N_5_1319_PB_2025

Tags

Readers

  • Aerospace Engineering
  • Munitions and Ordnance Engineering

Related Documents