GTCP36 Auxiliary Power Unit (APU)

Abstract

Provide timely responses to technical problems arising in the field during operational use. Review operational and repair reports, perform engineering analysis of failed engines and equipment. Perform investigation and testing as required to isolate/verify reported field problems and service revealed deficiencies (SRDs).

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2014
Source ID
177cf781c126651babcc987e254f0a80

Tags

Fields of Study

  • Engineering

Readers

  • Electrical Engineering
  • Logistics and Supply Chain Management.
  • Technical Research and Report Writing.

Related Documents