Release 1 and Release 2

Abstract

Release 1 and Release 2 continue execution of a subset of work previously performed under the System Developmemt and Demonstration (SDD) effort, while rapidly integrating upgrades or improvements (including limited urgent needs) fleet-wide. Development will combine the rigor of an event driven development process (referred to as a Technology Maturation Effort (TME)) with the expeditious delivery of a schedule driven integration and fielding process (referred to as a Release). These efforts may include, but are not limited to: Cryptographic Core Module (CCM), MTS-B Integration, Ground Control Station (GCS), Internet Protocol (IP) Migration, Synthetic Aperture Radar (SAR) Development, Extended Range, Station 1 & 7, Enablers Development, Multi Transit Ops, weapons integration, and testing on MQ-9 platform for capabilities such as rockets, missiles, bombs, guns and direct energy weapons, as well as software development required to support new capabilities. MQ-9 PoR and AFSOC will cost share during development, where appropriate, on joint efforts that are required by both programs to support the new capabilities.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2021
Source ID
17d3884b1863e487bdb6483cf68cbc1a

Tags

Fields of Study

  • Computer science

Readers

  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.
  • Naval Mine Countermeasure Systems Development.

Technology Areas

  • Directed Energy

Related Documents