Standard Missile-3 (SM-3) Block IIA Development
Abstract
The SM-3 Block IIA is required to meet EPAA Phase III. It will increase the area that can be defended by Aegis BMD, increase the probability of kill against a larger threat set, and leverage enhanced capability provided by BMDS sensor upgrades. Recurring Accomplishments: - Conduct SM-3 Block IIA software update to support engagements against additional threats - Conduct End-to-End Distributed Development System integration testing and flight test support - Continue transition to production for all SM-3 Block IIA development efforts - Comply with Engineering Manufacturing Readiness level through the life cycle of SM-3 Block IIA Specific and unique accomplishments to each FY are as follow:
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2025
- Source ID
- 18a93884f9a1affb93734417fea1ab79
Related Documents
- Root: AEGIS BMD