B-2 Modernization
Abstract
B-2 Modernization development of Low Observable Signature and Supportability Modifications (LOSSM), Proximity Sensor Logic Unit (PSLU), Massive Ordnance Penetrator (MOP) Integration and Enhancements, Integrated Windshield Solution, Training System core upgrades, Electro Magnetic Pulse (EMP) testing, Common Organizational Level Tester (COLT), Adaptable Communication Suite (ACS), Integrated Strike Warfare/Advanced Tactical Data Link development, Stores Management Operational Flight Plan Rehost and Mixed Carriage, other weapon integration efforts, Common Very Low Frequency Receiver, Mode S/5 IFF, and other airframe and avionics improvements.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2013
- Source ID
- 1cae91cea99052890109e984f9479c2a
Related Documents
- Root: B-2 SQUADRONS