Test and Evaluation (T&E)
Abstract
The T&E process will be a complete system test to validate system software requirements and to ensure compliance mandates are satisfied. The T&E efforts will be conducted at developer test site, Capabilities Integration Environment (CIE) and DISA production sites. The DEAMS Inc 1 Integrated Test Plan (ITP) and System Integrator (SI) Software Test Plan (STP) cover the details of DEAMS Inc 1 T&E.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2016
- Source ID
- 1db85bc1e1556c835d617a1cc6a16ef7