Test and Evaluation (T&E)

Abstract

The T&E process will be a complete system test to validate system software requirements and to ensure compliance mandates are satisfied. The T&E efforts will be conducted at developer test site, Capabilities Integration Environment (CIE) and DISA production sites. The DEAMS Inc 1 Integrated Test Plan (ITP) and System Integrator (SI) Software Test Plan (STP) cover the details of DEAMS Inc 1 T&E.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2016
Source ID
1db85bc1e1556c835d617a1cc6a16ef7

Tags

Fields of Study

  • Computer science

Readers

  • Aerospace Engineering.
  • Defense Financial Management and Audit.
  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.

Related Documents