Outfitting and Post Delivery
Abstract
Provides for the completion of ship outfitting to include: ship provisioning and fuel initial load out of repair parts, spares, and test equipment in accordance with allowance list ; providing technical manuals and required drawings; installation and validation of PMS and EOSS; crew training and completion of ship system certification requirements. Provides for the integration and testing of the Seaframe and separately acquired mission packages, implementation of instrumentation packages and validation of structural, sea keeping, hydrodynamic performance, emergent support during the execution of Post Delivery Test & Trials (PDT&T), Post-Shakedown Availability (PSA) to incorporate Engineering Change Proposals that allow for correction of trial card deficiencies, and mission critical upgrades, as required.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2012
- Source ID
- 1f59e94d3c19bbe1a1499d02cd098843