Government Tests and Modeling and Simulation
Abstract
Provides for costs incurred by the government to perform/validate system-related test activities. This element also includes costs of the detailed planning, conduct, support, data reduction, and reports from such testing. The actual test articles (i.e., functionally configured systems) are excluded from this element as they are included in the prototype manufacturing section.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2012
- Source ID
- 1fba37e0826dd4831b4db8c4aa2994dd
Related Documents
- Root: Manned Ground Vehicle